Demolition Permits in San Francisco, California
145 demolition permits filed recently
145 permits
demo (e) parking lot
interior renovation at 1/f and 2/f. demolition of (e) deck, pantry and kitchen renovation.
1st flr-horizontal addition @ rear yard w/ bedrm,bathrm,office & storage;convert (e)garage area into (conditioned space w/ laundry rm & mudrm;(n) interior stairs conneting 1st & 2nd flr;4)excavate gra...
unit #111: remodel guest bathroom - change vanity, toilet, lights, tub to shower. shower to be compliant with cbc section 1134a.6. no wall demolition/construction.
interior demolition to prepare for alteration work under separate permit, paritions are non-structural.
revision to permit 202501279110. revised basement interior layout due to conditions uncovered during demolition, including insufficient slab thickness and missing interior footings. new structural sla...
revision to bpa 2025.0428.5369 - revision includes demolition, dining interior, exterior facade, kitchen, and site changes
demolish concrete slab on back portion of 1st floor (garage slab to remain). including building seismic upgrade and residential interior remodel including kitchen and bathroom
building d-23: demolition of a type-v, 2-story, 8 unit residential apt building. aka address 65-79 watchman way- the building spans over two lots 4167/004 and 4223/001
non-structural interior demolition on floors 4,5, and 6 per ab-017
demo (e) type-vb 1 story detached garage.
14th fl - partial non-structural demolition and new tenant fit out of the 14th floor. work includes new partitions, ceiling doors, equipment and finishes. new mep
demolition of a type v-b, 2 story building in rear of lot.
10/f: demolition of existing non-structural partitions, decorative ceiling baffles, lighting, millwork and finishes. new constructuion of new finishes, millwork and decorative lighting. existing floor...
13/f: tenant fit out of 13th floor. non structural demolition. new partitions, ceilings, doors, equipment and finishes. mep.
11th flr - partial non-structural demolition and new tenant fit out of the 11th floor. work includes new partitions, ceiling doors, equipment and finishes. new mep
12th fl: non-structural demolition and new tenant fit out of the 12th floor. work includes new partitions, ceiling doors, equipment and finishes. new mep. create new opening in e) 13th/f slab, anchara...
spec suites 250 & 270 -2/f: interior demolition and new construction of non-structural interior partitions, doors, finishes, ceilings, lighting, mechanical and elctrical outlets and switches. mep & fl...
rear cottage: demolish a type-b 1 story utility cottage.
front: demolish of a single family type-b, 1 story, residential dwelling.