6th fl: minor work to construct an open coffee lounge, 2 phone rooms & demised lobby/reception area. work includes new non bearing partitions. 2 new doors, new lighting flooring, millwork, sink and pa...
1st floor and 1m mep ti: see arch pa # 202510036734. work includes: provide and install 7 fan coil units; condensate piping by plumbing contractor.
to obtain final inspection for work approved under pa# 202407106143. all work is approved.
at&t modification of (e) wireless facility consisting: r/r 3 antennas; r/r (3) rrus; remove (1) infinity power plant; 1 battery rack 2 converters 7 rectifiers (1) 225 cabinet; (20) 190 ah batteries. i...
replace f/a system and bring up to sf/ca code + add lf horns in units + wireless radio monitor.
reroof, no hot work. ref pa# 202602065423 for sheating repair.
sheating replacement. sheet metal flashing replacement. trim repair. ref pa# 202602065425 for sheating reroof.
to obtain final inspection for work approved under pa#: 202407015589. all work is complete.
as-built for 202509256140: added 2 heat detectors in boiler room and laundry area.
revision to 202407317615. the purpose of this revision is to provide new structural foundation design based on existing conditions.
mep permit for t.i. 202407186789 & 202511149590
convert (e) vacant commercial space into state adu.replace (e) wood transom window with operable wood transom that is consistent with the (e) frame.replacmeent of 2 doors and modify door along varenes...
renewal.
as builts in ref to 202102044068. added annunciator, smoke at top of stairs, updated device location for gateways. updated panel model to accomodate all devices. moved power supply from 3/f to 1/f.
replace (e) fire alarm system to comply with sffc 1103.7.6.1
install awning "canton market"
to install awning framing.
interior tenant improvement to convert vacant space to an ice cream shop. new interior partition, new ada restroom, and new finishes throughout including mep work. fire and life safety will be deferre...
legalization of existing metal roll down gate, installed before 2023, no motor, w=13.58ft, h=10.50ft.
legalization of existing metal roll down gate, installed before 2023, no motor, w=28.5ft, h=9.22ft.