Building Permits in ZIP 94133
San Francisco, CA — 212 permits filed recently
212 permits
to obtain final inspection for work approved under pa 202307313323, 202411195322. all work is complete.
to obtain final inspectio for work approved under pa# 202309126430 & 202401174078.
revision to bpa 202202238554: remove bathroom skylight from scope of work.
2/fl- ref 202512192346- includes provide and install 5 fan coil units, run line set from units to heat pumps on the roof
ste #113: as built submittal per inspector for first sprinkler work previous 202601093515. ref 202505126240 ti
l3: revision to pa #202601284695: revised booth locations and structural attachments of phone booths
to obtain final inspection for work approved under pa#: 202502200707. all work is complete
seismic upgrade to existing building. space to remain vacant per ab017. future accessibility to be restored under separate permit. no cfc until alteration permit restoring required ada features has be...
reroofing: remove 21 squares of roof and install 3ply torch system gta granulated modified bitumen. hot work included.
unit 4: existing non bearing portion of wall between kitchen and dining room to be removed.
exterior stairs less than 50% repair, new wood in kind, non-street facing.
1st flr: convert (e) kitchen to masterbedroom w/full bath. relocate kitchen to living room. relocate half bath and narrow (e) interior stair from 45" to 36" & build counter above. lower flr: add full...
remodel 2 bath, add one bath & one half-bathroom;install dropped ceilings for(n)lighting fixtures;replace wall mounted old gas heaters(n)mini-split hvac system,replace(e) single pane windows with new...
installation of an automatic fire alarm system for a new sprinkled "m" occupancygrocery store. scope includes full notification coverage, delayed egress, and sprinkler monitoring.
ground floor: deferred mep to pa #202508294258
g/f t.i. non-structural partitions, ceilings, restrooms, showers & lighting, new parking. office allocation & parking per 2022-009996 cua & 2022-009996 ofa. gym not for public use
reroofing no hot works
reroofing: remove (e) roofing down to the sheathing board and the surface will be cleaned. install one ply of app base membrane with roofing nails down. install second ply of certainteed torch down ro...
roof deck
refresh unit# f-110 w/ (n) flr @ 1st floor, remodel kitchen w/(n) caninets & appliances. (n) led lights in lieu of incondescent, replace (e) elec panel w/ (n) code compliant. no structural changes.