Building Permits in ZIP 94133
San Francisco, CA — 212 permits filed recently
212 permits
exteiro work updating (e) storefront at 1st floor, replacing (e) stair from 3rd to roof with reconfigured stair enclosure, replacing roof deck at (e) roof, adding (n) windows on east facade of buildin...
install 1 non-illuminated projecting sign in building inteior, sign #4, blade sign, "grocery outlet bargain market"
install 1 illuminated wall sign in building inteior, sign #3, "grocery outlet bargain market"
install 2 illuminated wall signs, 8" thickness, sign #1 & 2, "grocery outlet bargain market"
ti due to elevator modernization, add 1 smoke detector and 3 relay modules on the roof emr for elevator recall. re pa# 202301049667.
2nd floor primary bathroom remodel, new tile and fixtures. relocate plumbing, upgrade electrical and lighting to high efficiency led fixtures. no structural work and no walls moved
revision 202503263093- interior remodel of floor 1 to include (n) media room, game room, flex room, laundry area, and utlitily area. demo and excavation 21 cu3 of (e) concrete slab. (n) interior parti...
to obtain final inspection for work approved under pa # 201910245503. all work is complete.
solar permit: ballasted: n, including 1 energy storage unit, of 600 vac, with 13.5 kwh each in capacity, ess units will not be closer than 3 feet | 13.5kwh powerwall ( 1 ess )
as built ref pa 202512030882 installed 1 less head han original heads total. as built plans requested by inspector walling to reflect field installation "voluntarily"
re-roofing: remove existing in kind composition shingles and replace with new compositing shingles on roof, class a fire rated, modified bitumen membrance roofing system along with an approved certain...
b lvl & 1 lvl: new base building room and circulation spaces constructed. lvl 2,3 & n/s 4: new occupancy b office spaces provided. lvl 5: new residential unit to be provided. (e) ter lvl 5 renovated a...
revision to pa#202505126240. convert electric heat to gas heat. updated grab & go specfications. shifted meat, fish bunkers, and berry bin bse. suite 113 store # 610 for storefront frontwall location...
rear bldg: replace windows, printing inside, in-kind like for like. on the brannam place street side with fiberglass single hung windows within the same opening.
build 14'x16' 9" roof deck not visible from the street 3ft clear from side properties. building is only 22'9" wide with 0 lot lines.
upgrade fas in hotel portion of building to comply w/ 2022 code. restaurant space will be upgraded as part of future work.
remove broken floor tiles in bar area. replace w/ like in bottom basement area (approx 13 sq ft). repair affected wood flooring in main floor area (approx 10 sqft). all work in kind.
extend the vent on the (e) deisel fuel tank to 3ft above the parapet. replace the (e) fuel suction and discharge. r/r (e) fuel piping between day tank and generator.
revision to pa#202507160915. the 2 windows in kitchen, one will closed off and the other one willl be replaced. change kitchen layout, one window in living room , one in laundry room will be replaced....
the project is an interior remodel. (n) sliding patio door to (e) deck. change rear windows in kind.