Building Permits in ZIP 94131
San Francisco, CA — 325 permits filed recently
325 permits
replacing(1) entry door. non street visible at the rear. (e) wood-1x entry door, (n)steel-in-swing back entry door. no size change. door will be in the same opening. u-factor <.27
unit 210 - bath remodel 2 bath. all ork in-kind. convert tub to shower; kitchen emodel replace cabinets, counters, all work in-kind
replacing kitchen cabinets
replace 6 windows, 4 are street facing, material is fiberglass. 2 windows & 1 patio door in rear. mater is vinyl. no size change. u facter less than 0.27.
in kind repair - remove and replace damaged deckinf, deck joists, deck beams, posts and guardrails
remodel one bathroom like for like. upgrade electrical as needed and upgrade service panel 200 amps.
to comply w/ nov# 202173478: in kind bathroom remodel. replace shower & toilet. total 64sqft.
voluntary seismic upgrade in accordance to planset a cebc, california appendix chapter a3.
in kind repair - remove and replace damaged deckinf, deck joists, deck beams, posts and guardrails
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
unit 1: interior demo of all finishes (acm) in living room & kitchen. remove carpet. unit 2: interior demo of all finishes (acm) in all rooms. remove carpet. unit 3: interior demo of all finishes (acm...
tear off (e) roofing and reroof with torch down at flat roof. no work to front facade sloped roof. no work to (e) roof structural sheathing. no structural work.
unit 5: replace 3 windows and 1 sliding patio door. street visible.
exploratory interior demo of the 1st and second flrs. removed damaged sheetrock. approx. 10 no. of holes each 8' by 8'
unit 1: one window replacement, demolition 4" - 6" inches around the window, install scaffold, waterproof paper and lath, apply scratch coat, apply brown coat, and apply finish coat, not facing the st...
to obtain final inspection for work approved under pa#202304175857. all work is complete.
remodel (e) kitchen, dining & living room. raise floor at living room. propose floating steps at living room. new wall hung toilet at (e) powder room. new electric fire place at (e) living room. remov...
add bathroom to crawl space, add kitchenette to basement. foundation & structural work per plans. electrical & plumbing work to be carried out. adding new laundry in crawl space.
reroof, no hot work.
in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).