Building Permits in ZIP 94116
San Francisco, CA — 333 permits filed recently
333 permits
to obtain final inspection for work approved under pa#202104168722.
revision on permit pa #202512172021: to relocate existing internal stair from 2nd floor to ground floor. to remove ground floor kitchenette and add only wet bar and cabinets.
revision to pa 202601234425, 202602105600 this revision consists of adding drainage to the project as shown on sheets 2.1. we are also doing 10 ft extra foundation replacement
remodel 1 kitchen and 2 bathrooms like for like, replace ceiling insulation in kitchen and living room.
replace front of building stucco and repair 1/2 inch plywood underneath if needed. dining room will get new baseboard and new electrical; lights and plugs will be installed to code. per planning not a...
remodel kitchen and powder room
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
to obtain final inspection for work approved under pa #2024-0410-9722. all work is complete.
to obtain final inspection for work approved under pa# 202302222415, 202307142243, 202306029130. all work is complete.
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
replace in kind brick staircase, demo existing brick to rough framing rewaterproof & reinstall bricks, staircase visible from street, no stuctural work, approx. 200 sq ft, less than 50%
remove living room drywall finding leaking water from front 2 windows and replace 5/8" drywall with insulation, replace 2 front windows, like and like vinyl windows , in-kind.
install (2) non illuminated wall signs (heritage landscape supply)
drywall repairs: living room, bedroom, patch work.
replace front gate and hand rail
re-roofing: tear off and re-roof tar & gravel on back flat roof, tear off and re-shingle comp in front of house, no hot works, street spacing.
reroofing: flat roof only. flat 28 asphalt and paper, 80 torch down, modified bitumen granulate.
demolition on sheet rock to check on leaking, repair walls, paint job, retiling 3 bathrooms 2 are downstairs, 1 master bath without changing layout. replace siding and windows (2 windows) replacement,...
at&t: modification of an unmanned wireless facility. remove/replace 3 antennas, 3 rrus, 1 power plant, 1 batther cabinet. remove 24 batteries and install 20 new 210ah batteries. r/r converter and rect...
re-roofing: prime substrate w/vapor barrier - build up roof with 1" fesco insulation - not mopped down to concrete-substrate. install 1" iso 1/2" densdeck - adherred to concrete substrat adher 72 mil...