Building Permits in ZIP 94115
San Francisco, CA — 283 permits filed recently
283 permits
add 2 new wood windows to match (e) style at rear elevation. replace (e) door at the rear of thr property that leads to deck. replace non compliant guard rail at deck in kind with compliant rail. bath...
revision pa# 202512151802 per instructions from the field inspector to revise ap for the repair of the (e) stairs. more dry rot that anticipated was discovered require more replacement. these plans re...
remove and replace in-kind kitchen cabinets. remove and replace in-kind countertop. remove vinyl flooring and replace with engineered wood floor. remove (e) bathtub, tile, vinyl floor and replace with...
apply flexible crown saver over existing chimney crown to seal cracks. waterproof structure above roofline with water repellant. attach custom cap to top of chimney: replace in kind.non street visible
new bearing wall & footing. remove (e) column and provide new column. assessibility deferred under future ti per ab-017.
t.i.- exterior:remove (e) marqueel; replace (e) storefront windows w/ (n) aluminum windows. interior: (n) commercial kitchen; (n) accessible unisex bathroom; dining room w/ (n) finishes,furniture, kit...
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
201801108295 new bldg
new bldg 201801108297
renew demo
replace current bathroom by doing like for like repalcement. bathroom is appx 54 sq ft. replace current bathtub with a (n) bathtub 30" x 60". improve galvanized water lines with copper lines. install...
1870 fillmore: - change the counter bar top and change the shape of it. (per plans)
to obtain final inspection for work approved under pa# 202407166604. all work is complete.
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
surface will be repaved with exposed aggregate concrete. existing lamp posts will be relocated and new foundations constructed. new electrical service panel will be installed
surface will be repaved with exposed aggregate concrete. existing lamp posts will be relocated and new foundations constructed.
unit 5 - kitchen remodel, bathroom remodel, new half bath, rewire electrical, new lighting fixtures
level 00: tenant space build out for urgent care space. work includes new partitions, doors, restrooms, archorage for equipment, and finishes. mep included.
3/f: remove wall b/t kitchen and dining. remove fireplace. remodel kitchen and 2 bathrooms. r/r closet doors. remove low guard walls and provide new full height wood slats guardrail walls. new hvac sy...
manufacture and install (2) identical double faced internally illuminated blade signs: "super duper burgers"