Building Permits in ZIP 94114
San Francisco, CA — 392 permits filed recently
392 permits
reroofing: tear-off (e) roof system and installl 3ply modified bitumen roof system. torch down. 800 sq ft.
recommencement and completion of work approved under pa#202412096401
upgrade e fire alarm system to comply with sffc section 1103.7.6.1 to meet 75 db in all sleeping areas
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
legalization of (e) ground fl unit @ rear of builg per ordinance 43-14. for a building total of (3) residential units.remove connecting interior stair;infill fl framing assembly to separate ground.ent...
in-kind remodeling of 1 kitchen(s) in 1st fl
kitchen and bathrooom remodel at 2nd floor. bathroom remodel at 3rd floor. reframe (e) addition at rear. partal (n) foundation. rebuilt/reconfigure stairs. (*n) doors and windows in rear
remove and replace 6 windows @ back & side not visible from street, same size, location, opening and material. all windows are common area.
upper floor: convert existing closet to full bathroom with shower, double vanity and toilet. no wall changes. and upgrade of electrical to 200amp.
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
revision to pa #202502180460; new plumbing fixture count total; additional bar sinks, ice makers, and hosebibs.
reroofing: remove 500 square foot shingles and install new underlayment paper and install 30 years lammark shingles gta, reference#202601284702
remove 1 piece plywood on the back to the roof end, install 1 new piece plywood, reference #202601284705
replace wood siding from the back of property, approx 1500 sq ft. new materials. install new hardie plank lap siding, replace 11 windows (uf<=0.27), new anderson single hung and 2 sliding fiberglass....
removed existing fire place/enclose closet area. create new bathroom on the primary bedroom.
interior remodel to unit 4135 at 2nd floor to include bathroom and kitchen.
four dry stacked stone retaining walls (wall d, e, f, g) of varying heights. walls are primary a mix of a2 flagstone & connecticut bluestone w/ riverstone & onxy accents.
revision to 202508294235 to gas & electrical wall heaters to be replaced w/ heat pump split system. bathrooom layout reconfigured
flatten (e) roof to bring upper level to livable ht standards and windows to code. additional outdoor deck space to be added with new roof.
evacuation signage for pa202402296854.