Building Permits in ZIP 94112
San Francisco, CA — 349 permits filed recently
349 permits
reroof like for like
remove (2) closets to remodel the existing kitchen, the full bathroomm on the second floor will be remodel"in-kind". a small 12 sq ft pop out at the rear of the second floor will be removed. (1) door...
replace west wall with hardie board siding & windows in like kind because of dry rot repair. replace framing.
revision to appl #202201125841: remove windows at left wall (side) of (e) building create (n) 1 hr exterior wall on exterior of side.
to comply with nov 202652356 - replace lathe and plaster, sheet rock, 2x4-2x6, flooring, carpet, electrical boxes, recepticals, smoke detectors, breakers, roof, (2) windows, and plumbing.
change of use from vacant commerical tenant space to a residential dwelling unit. interior alterations including new partition walls, kitchen, bathroom and associated mechanical, electrical and plumbi...
solar permit: installing 8 solar pv modules, 405 watts per module, total no. of rating 3.24 kw. mounted: roof, ballasted: n, including 1 energy storage unit, of 13.5 vac, with 13.5 kwh each in capacit...
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).
legalize existing awning nder awning amnesty program dbi complaint # 202293028 (a-1 cafe bakery) size of sign 23x3
legalize existing projecting sign under awning amnesty program (a-1 cafe bakery) size of sign 8x2
1st flr: remodel (e) floor space to 1 master suite, media, wetbar and laundry. at 2nd flr: remodel (e) kitchen and dining and powder room. 3rd flr remodel (e) bathroom and add new bathroom.
comply nov202430568: legalization of (e) 3/f adu. addition / confirmation of full kitchen familities. conversion of (e) family room to bedroom. conversion of (e) guest room to living room.
to erect a 2-story, type 2a, office building.
construct 2 bedroom, 2 full bath, family room, & install wetbar at g/f. remodel (e) kitchen, bathroom, and add new bath at 2/f.
prop h:complete renovation of children's play area.this includes removing(e) plastic play equipment & the synthetic safety surface beath it.the new play area will feature a nature play theme,incorpora...
revision to 202301190397: wall layout reconfiguration, change new ada ramp restroom, ada kid restroom.
state adu program- convert garage space into adu.
to obtain final inspection for work approved under pa# 20203126945 & 202003126950. all work is complete.
re-roofing: remove and replace roofing material / existing roofing material (in-kind)