Building Permits in ZIP 94111
San Francisco, CA — 223 permits filed recently
223 permits
revise pa #202204111970 and 202507080363 to document approved code equivalency for panic hardware at exit gates of redwood park.
add staircase handrail at front door. add ada front door button, add grab bars at both bathrooms for ada all work is interior. change of use from office to wine bar
19th fl - deferred mep for bpa 202509044565
24th/fl: relocate 181 upright sprinklers on the 24th floor for demo.
17th fl - deferred mep for bpa 202508153152
18th fl - deferred mep for bpa 202508153152
2nd & 3rd fl: interior t.i. demo of non structural interior partitions, doors, ceiling finishes, mep. new partitions, doors, finihes, ceiling, mep. work also included ada restrooms upgrdes
basement & 1st/f: interior t.i. demo of non structural interior partitions, doors, ceiling finishes, mep. new partitions, doors, finihes, ceiling, mep. work also included ada restrooms upgrdes
6/f and 7/f: interior t.i. removal and construction of non-structural partitions, door assemblies, light fixtures, plumbing fixtures, millwork, electrical outlets, and new finishes. mep, fire life saf...
7/f: bathroom full remodel. full removal of existing fixtures and finishes new fixtures and finishes and lightening and devices signage. deferred fire & mep.
unit 505: bathroom remodeling (tub) like for like. will demo, install new valve, tub replace toilet, vanity and new tile.
deferred mep for 15th floor office ti. ref pa 202602176020; 202511109274
replace kitchen facuet & countertops. install new 1/4" copper water line for refrigerator ice maker. no cabinet replacement, no layout changes - bathrooms (2) replace bathtub in-kind in (e) alcove. re...
ground floor:exterior improvemnts include the replacement of murals/infill panels and restoration of store front glazing to match existing.all new or revised meps and life safety work will be design-b...
ground fl- meps for pa # 2025-1021-7827
suite 1125 revision to pa #2025-1029-8346: install freestanding atm machine. structural details included
2nd floor revision to mechanical design. new ducts, heating and air. structural for opening in concrete wall for duct thru.
11th fl - relocate 36 pendent sprinklers ref pa 202510238040
relocate 4 pendents on the 12 fl; relocate 23 pendenta on the 13th fl; relocate 32 pendents and 10 uprights on the 14th fl. 12th fl - 202511058940, 13th fl 202511058944, 14th 202511058945
revision 202501178593-install of a new fire panel and cellular communicator all fire alarm devices shall be new