20th fl - meps for pa 202511109312
upgrade existing fire alarm system: 1 fire alarm control, 1-power supply, 1 led annunciator, 1 cellular communicator, 4 smoke detectors, 3 heat detectors, 4 weather proof pull station, 6 pull stations...
fire alarm ti based on pa # 202502120165: added 20 duct detectors, 12 new hvi units interface, revissed notification at level 1 & 2.
interior tenant improvement 32nd fl. provide new accessible single use gender neutral restroom
barrier removal work only to renovate existing restrooms to become an all-gender and accessible restroom at an existing retail space. no change to area, use, structural, exits, fire life and safety sy...
18th floor: mep project. ref pa #202511048826
administrative revision permit 202503172391 to cover sheet g-0.00 to show no mechanical work. added e0.0, e0.1, e0.2, e0.3, e0.4, and e1.0
4th fl - ref arch 202510288260 mep for project
to obtain final inspection for work approved under pa #200004127090. all work is complete.
to obtain final inspection for work approved under pa #200207030635. all work is complete.
replace fire alarm system to meet sf/ca codes and add lf horns inside all units _+ add wireless radio monitor.
revision to pa#: 202512232542. per field inspectors notes. evacuation maps
deferred mep for 17th floor ti under permit 202510217772.
fire alarm upgrade to comply with sffc 1103.7.6.1 in non-sprinkled building.
replace fire alarm system to meet sfca codes and add lf horn in all units and add wireless radio monitor.
12th floor: oti minor upgrades to an existing occupied suite: 3 new offices with associated non-rated partitions; doors, frames, & hardware; power/data; etc new break area casewrok, appliances, & floo...
revise mechanical drawing in pa# 2025-0212-0165 to show changes and additional fire/smoke dampers
to comply with nov 202649042: removal of mold-impacted drywall a laundry rooms on 8/10/12 floors wall. replace like for like to match (e) fire-resistance rating. no changes to occupancy, layout, struc...
metal roll-down gate, installed before 2023, with motor. (streamlined building permitting for existing security gates)
install 1 wall mount horn strobe; install 4 eiling mount strobes; install 3 ceiling mount horn-strobe; install 1 smoke detector; install 4 duct detectors; install 6 control relays; remove & install 1...