Building Permits in ZIP 94108
San Francisco, CA — 147 permits filed recently
147 permits
ti to include (n) non load bearing partitions, storage racks, furniture, equipment, lighting, and millwork. (n) accessible fitting room, restroom and drinking fountain
removal of kearny street pedestrian bridge that connects sf rec and park property to hilton hotel. scafolding and shoring will be deferred submittal.
19/f: addition to existing two-way communication system. provide and install new call station at 19/f elevator lobbies per cbc section 1010.2.12.1.5. pathway survivability shall be level-3 for the two...
like for like replacement for make up air unit.
4th fl - tenant improvement to include open office, phone rooms, break area
unit#8: plumbing: replace fixtures w/ new shower & toilet. electrical: replace electrical fixtures, repair oldwiring building. new floor, patch holes in nails, new kitchen countertop. (all work in-kin...
unit #10: plumbing replace fixtures w/ new, new shower & toilet. electrical replace electrical fixtures repair old wiring. new floor, patch holes in walls new kitchen counter top. no exterior work, no...
34/f suite 3400: mechanical and electrical submittal to support approved t.i permit 202602125795. duct distribution is being modified per new space plan. new lighting and power.
ste 3400: t.i. includes soft demo of (e) non-str partitions building, new non-str partitions. meps to be sep permits. building is full sprinkled.
tenant improvement 1st fl remodel existing retail space to jewelry sale. existing heating and ventilation to remain. no change of occupancy.
replace fire alarm system to meet sf/ca code & add lf horns in units & wireless radio monitor
revision to permit 202511260493. minor changes to coffee bar and equipment. revise coffee bar and equipment associated at back of the house.
install (2) identical raceway with illuminated 17 channel letters signs: "haraz coffee house" facing street.
4th fl - permit revision ti permit 202510288260 for remodel of existing communication stair and a technical infeasibility @ women's restrooms
7/f: structural reinforcement at two beam locations for gym equipment. building is fully sprinklered.
front window box: repair/replace tile veneer at under storefront windows. normal maintenance to replaced cracked tiles/veneers in-kind as needed. 40lf.
as built of bpa: 202511260480 - adjusting automatic fire sprinklers system to provide coverage per area of construction modification , all hangers and sway bracing are existing, hangers added to new a...
ref pa# 202601214264: hvac modifications to support interior tenant. all terminal units are existing. (e) central equipment, (e) controls.
3/f: partial office tenant improvement. arch - addition of new non-structural, non-rated drywall partitions per plan for existing office reception area with new floor finish and new drywall drop ceili...
revison to pa# 202506279718. revision to non structural partitions, mep, structural elements. level 1.