Building Permits in ZIP 94107
San Francisco, CA — 258 permits filed recently
258 permits
bathroom remodel like for like ¿ shower to shower on first floor, upgrade mep to code, replace toilet, sink & vanity.
comply w/ nov 202546412. e) kitchen remodel @ 1st/f, e) non-bearing wall removal @ 2nd/f. e) bathroom remodel @ 2nd/f, addition new washer/dryer at 2nd/f, hvac system to be replaced, water heater to b...
revision per approved pa#: 201308285446. additional building massing at rear yard. stair access to garage; new roof deck access alteration to garage to avoid adjacent foundation.
repair of damage caused by fire to (e) building and rear deck to comply nov202535024.all interior finishes includuing casewook, tile, wood flooring,plumbing and lighting fixtures shall be replaced ink...
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
installation of 144" tall pallet racking in receiving processing room and display room
to obtain final inspection under pa# 9912819. all work is complete.
revision to pa 202503142280 to demolish existing illegally built bathroom & propose new powder room
1st/f ste# 150: revision to 202512030848, install 2 phone pods
(ste 350) deferred mep to pa# 202510026586: tenant improvement project/alternation of (e) office space. mech modifications to accomodate architectural layout changes. ductwork, with insulation as need...
suite 100: mech modificaitons for ti.i. 202511200064: new vav boxes, ductwork and hot water piping with insulation as needed. reconfig of (e) ductwork and air distribution ddc controls and air balance...
reroof w/hot works, proposed cool-roof material (crrc# 0742-0018) exceeds minimum solar reflectance and solar reflectance index values.
revision to 202502079867, relocateion of metel frame on floor joist to accomdate job site need. change beam size of one frame
suite 100: office tenanat retrofit-lighting fixtures and associated circuting/controls, power and signal devices and associated wiring. ref pa#202511200064
replace (e) north entry wall/fence and gate; provide (n) court yard garden podium & wall
re-roofing. no hot works. no work to (e) roof structural sheathing.
fire only - as build pa 202407116233 wrong backflow from field to approved plan
4th floor: new common corridor, new idividual tenant suites & restroom renovation. demolition of (e) non structural partitions construction of non structural partitions, doors, lights fixtures & plumb...
revision to permit #202509034442, tenant improvement, entry door reconfiguration, conference room addition, finishes, electrical/plumbing is design build
(n) commerical wash area in (e) tenant space connection through non structural wall to adjacent space