Building Permits in ZIP 94107
San Francisco, CA — 261 permits filed recently
261 permits
remove 100 sq ft wood deck boards only. replace with trex boards 100 sq ft less than 50%. rear deck.
bathroom remodel like for like replace shower, sink, vanity, toilet, fan upgrade mep to code. 63 sqft kitchen remodel like for like. 72 sqft. unit 208
to obtain final inspection for work approved uner pa# 202012181341. all work is complete.
re-roofing: remove existing roof and install new torch roof.
rear horizontal & vertical addition. remodel/reconfig (e) sdf to add 1 new unit. add new 6 bathrms. remove (e) kitchen & replace w/new for lower unit. add kitchen & living spaces for upper unit. expan...
unit 12- kitchen remodel , replace cabinets, countertops, switches, outlets and modification of the drain waste vent line for the sink . addition of (n) island. no wall demolition or construction, no...
revision to permit 202107285305-s1. changes to closets. change to vestible. new windows at rear. change to steps/stair - interior.
kitchen remodel, replace sink, faucets, dishwasher, replace swicthes, outlets, lights, fridge, replace kitchen cabinets ,countertops,stove. all work in kind.
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
install (87) new fire sprinklers in basement and first floor at new drop ceilings per nfpa #13. ref bpa: 202602035133
reroofing hot works
unit a: comply w/ nov # 202649306 (#2) repair or replace in kind walkway/deck. not visible from st.
erect type 1a over 4a 21-story 272 unit residential/commerical building.
4/fl- ti 202601143793- relocate and add fire sprinklers on level 4 due to (n) wall and ceiling configurations. relocate (1) ssu, add (2) ssu, demo 1 ssp
minor ti of (e) space at ground floor. (n) bathroom at (e) plumbing. (n) non structural walls, counter, and cabinets. new lighting (electrical). establish general retail use. demising one tenant space...
ste 400 - revision pa 202511139521 to remove mep from deferred submittal on sheet g0.0
revision to pa 202302031391 scope of work to include installation of (n) electric matt in floor heating to replace (e) electric base board heating units floor heating units at the 3rd fl. no increase...
in-kind remodeling of 1st floor kitchen and bathroom. installation of shower pan and service equipement; need a "greeb tag" for electrical service equipment.
like for like replace e) fire alarm system, like for like replace e) sismons system to autlcall system, replace e) initiating devices from siemons to autocall devices, replace e) monitoring devices fr...
1st fl & basement improvement: new non structural walls & partitions. new interior finishes, two new bathrooms, one new mother's room with sink, two new sink counters. mep modification. change of use...