Building Permits in ZIP 94103
San Francisco, CA — 230 permits filed recently
230 permits
install one (n) fire suppression system in kitchen hood on 1st floor. ref 202512121648
swap out for existing ssp's for 4 new dry pendents ref#202512192276
exterior dry rot repairs and stucco repairs. street visible, less than 50%. in kind
13/f: installation of 2 - 32sq.ft. phone booths.
#3000 int'r modifications to an existing auditorium, amc screen x projection technology, including installation of side-wall projection equipment; modifications to the existing screen and new interior...
voluntary installation of a new automatic and manuel fire alarm sytem. ref#: 202308033645.
at&t modification of (e) wireless facility consisting of r/r 3 antennas, 3 rrus; remove infinity pp & rbs2206 cabinets; 9 rectifiers & 4 converters; install 1 netsure 7100 w/58v convertion pp; 11 rect...
legalization of 2 units: 320 & 324, through the adu program (sfpc 207.1).
to obtain final inspection for work approved under pa# 202408052946. all work is complete.
revise fire sprinkler system to accomodate new tenant floor ceiling plan
install interior storage racks
to obtain final inspection for work approved under pa# 202106081868. all work is complete.
roof level: fire only work for the elevator modernization of cars 2 and 3 at the roof level machine room under 202112154499. additions are 1 smoke detector and 2 modules.
relocate 117 pendents and 7 uprights on the ground flr. relocated 132 pendent, 13 uprights and 17 window sprinklers on the 2/f. relocate 103 pendent, 17 uprights and 14 window sprinkler on 3/f. new st...
recommencement and completion of work approved under pa #202407055875 & 202409271800.
deferred mep for 202410072461, 202512. delete a toilet and exhaust fan approved for installation under 202505037798. ref drawings attached.
demo (e) rear exterior wall that is failing and becoming an imminent hazard. install temporary shoring/wall as required.
ref pa 202509195770 ti relocate 39 heads
unit 102: repair ceiling drywall approx 36 sheets (5/8 gyp-x) and flooring in unit.
rear bldg: construction of a 3 story residential type iii-a over i-a building with 4 residential dwelling units.