Building Permits in ZIP 90272
Los Angeles, CA — 1,006 permits filed recently
1,006 permits
Remodel (e) pool per std plan #268 and suppl eng details. add new spa and reduce depth of existing pool. work within existing shell.
2025 wildfire rebuild eo8 eligible, site grading
2025 WILDFIRE NEW, DEATCHED ACCESSORY DWELLING UNIT WITH ATTACHED 2-CAR GARAGE PER LAMC 12.22A.33(b)(1), 1-STORY, 75'-10.5"X26'-1". NFPA 13R SPRINKLERS THROUGHOUT EO1.SOLAR INSTALLATION EXEMPT PER GOV...
***eo8 eligible wildfire rebuild*** grading for new basement and site retaining wallsmultiple 2 of 4
2025 WILDFIRE REBUILD, SINGLE-FAMILY DWELLING WITH AN ATTACHED GARAGE, 2-STORY, 97'2" x 47'6". NFPA 13D SPRINKLERS THROUGHOUT. INELIGIBLE.
2025 WILDFIRE REBUILD, SINGLE-FAMILY DWELLING WITH AN ATTACHED CARPORT, (1)-STORY, _95FT_x_34.3FT_. NFPA 13(D) SPRINKLERS THROUGHOUT. INELIGIBLE
2025 WILDFIRE REBUILD. NEW 2-STORY TYPE VB SINGLE FAMILY DWELLING WITH ATTACHED 2-CAR GARAGE. 81'-7 1/8" x 30'-0", NFPA 13D SPRINKLERS THROUGHOUT. INELIGIBLE PROJECT.
2025 WILDFIRE NEW, DETACHED ACCESSORY DWELLING UNIT PER GC 66323(a)(2). NFPA 13D SPRINKLERS THROUGHOUT INELIGIBLE
Grading permit for proposed dwelling .
2025 wildfire rebuild, single-family dwelling, (2)-story. nfpa 13d sprinklers throughout
***2025 WILDFIRE NON-ELIGIBLE REBUILD PROJECT*** new 2-story House w/ basement garage *** 1 of 4 *** Fire sprinkler NFPA 13D throughout.
2025 wildfire, grading/ excavation for new swimming pool.
***2025 WILDFIRE NON-ELIGIBLE REBUILD PROJECT*** shoring for basement *** 2 of 4 ***
*2025 wildfire project* eo1 rebuild of two story sfd w/ basement garage with an adu on the 2nd floor.
2025 wildfire rebuild, grading for new single family dwelling. eo1 eligible.
2025 wildfire , new swimming pool with baja and automatic pool cover per standard plan and engineer details.
***2025 wildfire rebuild eo1 eligible project*** supplemental permit to 25010-20000-04618 for truss plans. capture permit fees (different owner prior to wildfir).
1 bathroom(s).Bathroom remodel for residential buildings (no structural changes).
***2025 WILDFIRE NON-ELIGIBLE REBUILD PROJECT*** site retaining wall *** 3 of 4 ***
***2025 WILDFIRE NON-ELIGIBLE REBUILD PROJECT*** grading for site & basement (594 cy) *** 4 of 4 ***