Building Permits in ZIP 90048
Los Angeles, CA — 129 permits filed recently
129 permits
Demo the (e) garage
Application of an approved coating to an existing roof.
Kitchen remodel for residential buildings (no structural changes).
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 5 Squares. Class A roof covering is required within Very High Fire Hazard Severit...
Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing_25_____Squares. Class A roof covering is required withinVery High Fire Hazard Severity Zone(VHF...
UNDER CONSTRUCTION - Deferred submittal for L1 Post-tensioned shop drawings. Main Building permit# 22010-10000-04364;Early start foundation permit# 22010-10002-04364.
EPLAN. INSTALL (1) NEW WINDOW SIGN SIGN E: 45.5"X45.5"; 13.8 SF AND 7'-2" above F.G.
Remodel to (E) Duplex. Scope of work to include: adding 1 bathroom, 1 powder room, replacing some windows, and kitchen remodel in each unit.
Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing 30 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone (VHFHS...
New patio cover, all work per engineer
Units: 204,205,206,304,305,306,PH4,5,6-Application of an approved coating to an existing exterior balcony or deck.
New ADU addition to existing detached garage
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 35 Squares. Class A roof covering is required within Very High Fire Hazard Severi...
One (n) illuminated interior mall wall sign read "swaine" 15' x 65.25" = 6.8 sqft, 135" above grade
ePlan: SUPPLEMENTAL TO 24016-10000-38189 FOR CHANGES IN FLOOR PLAN AND EQUIPMENT LAYOUT . (NO CHANGE IN PLOT PLAN) .
Supplemental permit to 25014-20000-04622 to revise framing and foundation plans
ePlan: Tenant improvement to remove partition wall and combine rooms 5051 and 5056 into new tissue culture room. Remodel ceiling and floor finish.
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 38 Squares. Class A roof covering is required within Very High Fire Hazard Severi...
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing ( 89 ) Squares. Class A roof covering is required within Very High Fire Hazard Se...
New patio cover addition per iapmo #0532