Building Permits in ZIP 90042
Los Angeles, CA — 278 permits filed recently
278 permits
Interior and exterior alteration and structural underpinning of foundation to (e) 2-story S.F.D.Windows infill, new window and doors, new bathrooms, kitchen and bathroom remodel.
REMODEL OF (E) 2-STORY SFD INCLUDING NEW BEDROOM AND NEW ROOF FRAMING. NO SQFT ADDED.WORK DONE PER ENGINEER DESIGN***13D SPRINKLER REQUIRED***"COMPLY WITH DEPARTMENT ORDER effective date06/12/2024. PE...
Supplemental to 24014-10000-05574: Revise scope of work to: (N) Garage and ADU per LAMC 12.22A33(b)(1)
Supplemental permit to 25016-10000-07454 to remove structural inventory and revise work description to "remodel of existing 2 story single family dwelling. work includes new bathrooms and kitchen remo...
Voluntary foundation repair per la standard plan 1 and wfpp.
REMODEL (E) GARAGE, NO CHANGE IN BUILDING DIMENSION. "COMPLY WITH DEPARTMENT ORDER effective date06/12/2024. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE"
Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over EXISTING solid sheathing _20_____Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone (...
Demolition of (E) Garage
eplan:154 sqft addition to (e) SFD. Relocate kitchen, 2 new bathrooms, interior remodel, replace all windows (1 of 2)
Garage: remove post and upgrade beam (2 of 2)
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft.over existing solid sheathing ___22___Squares. Class A roof covering is required withinVery High Fire Hazard Sev...
Supplemental to revoked permit 15010-10000-03286, to allow the 6 ft - 1 1/8 inches at the westerly side yard setback for the use and maintenance of a built single-family dwelling in lieu of the 7 ft r...
8 window(s). Window and door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is required for doors and wind...
Add sill plate anchor bolts and plywood to cripple walls (if existing) per LA City Standard Plan #1; no foundationreplacement (Earthquake hazard reduction per Chapter 92 of the Los Angeles Building Co...
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 4 Squares. Class A roof covering is required within Very High Fire Hazard Severit...
2 bathroom(s).Bathroom remodel for residential buildings (no structural changes).Replace drywall (no new walls added) for single family dwellings and duplexes only.Kitchen remodel for residential buil...
Supplemental permit to 25010-10001-02347 to Deepen footings as requested by Home owner from 24" to 48 " install concrete slab under house to tie footings together for as recommended by engineer for a...
Add sill plate anchor bolts and plywood to cripple walls (if existing) per LA City Standard Plan #1; no foundation replacement (Earthquake hazard reduction per Chapter 92 of the Los Angeles Building C...
Add sill plate anchor bolts, add plywood to cripple walls (if existing), and replace foundation per L.A. City Standard Plan #1 (Earthquake hazard reduction per Chapter 92 of the Los Angeles Building C...
Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over new solid sheathing _16_____Squares. Class A roof covering is required withinVery High Fire Hazard Severity Zone (VHFHSZ...