Building Permits in ZIP 90041
Los Angeles, CA — 185 permits filed recently
185 permits
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 4 Squares. Class A roof covering is required within Very High Fire Hazard Severit...
2 bathroom(s).Bathroom remodel for residential buildings (no structural changes).Replace drywall (no new walls added) for single family dwellings and duplexes only.
Remove and replace attached deck and stairs on rear unit.
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 30 Squares. Class A roof covering is required within Very High Fire Hazard Severi...
2 window(s). Window and door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is required for doors and wind...
ePlan. Supplemental permit to # 25014-10000-04495, to change stuctural design per engineering update structural plans
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over new solid sheathing 6 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zon...
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 11 Squares. Class A roof covering is required within Very High Fire Hazard Severi...
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 16 Squares. Class A roof covering is required within Very High Fire Hazard Severi...
ePlan: New Detached Accessory Dwelling Unit per LAMC 12.22 A.33(b)(1). Design per licensed engineer.
1 bathroom(s).Bathroom remodel for residential buildings (no structural changes).
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 40 Squares. Class A roof covering is required within Very High Fire Hazard Severi...
New pool with spa per standard plan 268 and engineer detail
Excavation for the new pool and spa.
eplan. Supplemental permit to 23020-10000-00788 for structural revisions to retaining wall by adding piles for foundation
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 17 Squares. Class A roof covering is required within Very High Fire Hazard Severi...
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 8 Squares. Class A roof covering is required within Very High Fire Hazard Severit...
convert existing carport to ADU and addition
Supplemental to Permit 24010-10000-03514 to add fire sprinkler to ADU plans and PCIS.
*EPLAN* ADD 13'-11" X 16'-1" ON FIRST FLOOR TO EXISTING GARAGE; ADD 19'-3" X 33' ACCESSORY DWELLING UNIT PER LAMC 12.22 A.33(c) and (d) ON SECOND FLOOR