Building Permits in ZIP 90003
Los Angeles, CA — 104 permits filed recently
104 permits
New 3 story duplex with attached garage (bldg b). fully sprinklered.
New 3 story duplex with attached adu ground floor and garage(bldg d). fully sprinklered.
ORDER TO COMPLY ISSUED: 05/07/2009INSPECTOR: FELIPE PENICHE PHONE: 2137631177Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing___22___Squares. Cl...
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over new solid sheathing 50 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zo...
**eplan****: NEW WAREHOUSE WITH MEZZANINE. CORE AND SHELL ONLY, TENANT IMPREVEMENT WILL BE UNDER A SEPARATE PERMIT.
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 16 Squares. Class A roof covering is required within Very High Fire Hazard Severi...
COMPLY WITH DEPARTMENT ORDER effective date11/08/2024. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATENEW 2 DETACHED 2 STORIES ADUS Per GC 66323(3)(4)
COMPLY WITH DEPARTMENT ORDER effective date11/08/2024. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE.demolition of (e) 2-car garage
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 15 Squares. Class A roof covering is required within Very High Fire Hazard Severi...
Concrete block freestanding masonry fence walls constructed per Information Bulletin P/BC 2020-096 located in residential zones, maximum 6 feet height above grade, and not located in the required fron...
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 16 Squares. Class A roof covering is required within Very High Fire Hazard Severi...
"COMPLY WITH DEPARTMENT ORDER effective date 11/19/2025. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE". Kitchen/bathroom (1) remodel for residential buildings (no structural changes).
Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing___35___Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone(VH...
ePLANNEW DETATCHED ADU PER LAMC 12.22 A.33(b)(1),(c),(d),(h) and (k)
ePlan. Conversion of (E) Attached Garage to ADU per ." COMPLY WITH DEPARTMENT ORDER effective date 10/15/2025. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE"
PROPOSED 1-STORY 22'-6" X 32' A.D.U. PER GCS 66323(a)(2) AT REAR OF LOT.
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over new solid sheathing 12 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zo...
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 25 Squares. Class A roof covering is required within Very High Fire Hazard Severi...
Supplemental to 25014-30000-02889 to provide correct structural sheets for attached ADUCOMPLY WITH DEPARTMENT ORDER effective date 04/15/2021. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE. CEIS Case...
Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing 15 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone (VHFHS...