Building Permits in ZIP 78757
Austin, TX — 539 permits filed recently
539 permits
Replacement of complete existing central heat and air system with or without duct work Carrier (2) stage
Gas test on house for a locked meter Repairs are complete
ePlan: Residential Expedited Review - Addition and Remodel to Existing 2-Story Single Family Res. [5bed 3bath] Work to include: enclosing existing breezeway and convert carport to garage with accessor...
New In-ground 300 SF Concrete Pool and associated equipment and pad.
Installing a new irrigation system
Bldg 2: New construction 3-unit use single-family residential 3-story 3 bedroom 3.5 bath with attached 1-car carport covered front porch 2nd floor rear uncovered wood balcony with exterior stairs and...
For Building F (Units 27-30) Approx 65 of drain pipe replacement under building that will be tunneled starting at cleanout
Install illuminated sign cabinet with face-lit channel letters reading STACK CITY on West elevation
Partial demolition 2-story addition/interior remodel to existing single family residence. Add 2 bedrooms 3 bathrooms game room balcony storage and covered patio. New Total: 4 bed/5 bath
Need temp power pole and power removed from existing home which is under remodel currently. The BP 2026-023187 is active. The EP 2026-023187 is pending and currently in review by the AE Design Team du...
40gal gas water heater changeout Whole House Emergency Water Shut Off
Total Demo of SFR 1285 sqft circa 1965
Remove and reinstall existing water heater and bring to code.
Bldg 3: New construction 3-unit use single-family residential 3-story 3 bedroom 3.5 bath with attached 1-car carport covered front proch 2nd floor rear uncovered wood balcony with exterior stairs and...
During course of excavation unmarked poly gas line was hit. Gas has been shut off repair has been made and system has been put on air test.
*Retroactively permitting* Interior Remodel - Replacing all windows siding structural members of the front porch preparation for a new utility box and adding awnings to eastside of the house.
Total demo of sfr 1300 sqft circa 1956
For Building A (Units 35-38) Approx 65 of drain pipe replacement under building that will be tunneled starting at cleanout
*Retroactively permitting* Interior Remodel - Replacing all windows siding structural members of the front porch preparation for a new utility box and adding awnings to eastside of the house.
Bldg 1: New construction 3-unit usen single-family residential 2-story 3 bedroom 2.5 bath with attached 2-car garage covered front porch and covered rear patio.