Building Permits in ZIP 78745
Austin, TX — 744 permits filed recently
744 permits
Addition/ remodel of existing 1 story SFR
Replacement of an existing water heater Replace existing tanked water heater with a Navien tankless water heater
Express- Install 14 press piers
New construction of 2 story duplex with 3 beds 2.5 each with attached 2 car garage covered entry covered back patio
New constuction of a 2-story single family dwelling in a condo regime. 3 BEDROOM 2.5 BATH 2 ATTACHED 2 CAR GARAGE
Replacement of an existing water heater Install 40 gal water heater
Express- Replace tub to shower 1 piece prefabricated acrylic no electrical work needed replace valve with new shower valve only working in wet space.
New construction of 2 story duplex with 3 beds 2.5 each with attached 2 car garage covered entry covered back patio
Install new 7.225 kw rooftop solar system for existing residential only.
New constuction of a 2-story single family dwelling in a condo regime. 3 Bedroom 2.5 Bath with attached 2 car garage
Express: replacing 7 windows and 1 door like-for-like in an existing residential home.
Express- Replace tub to shower 1 piece prefabricated acrylic no electrical work needed replace valve with new shower valve only working in wet space.
Structural and interior repairs following a fire in the suite. Repairs include - replacement of damaged trusses metal roof decking and roof replacement for Suite 105
Emergency gas meter relocation due to TX gas having a leak on there main. Moving the new gas meter location away from windows AC Electrical and vents.
New accessory structure with living space & 1 bathroom.
We are building a 200 amp service
Total demo of SFR 1194 sq ft circa 1971 ***The building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in Steps 5 & 6 of the Demolitio...
ePlan: Residential Expedited Review - New construction of a two-story single family residence with two car garage rear patio 4 bedroom 3.5 bathroom.
We will have our tunneling crew dig a 3 x 3 entry point outside the exterior bathroom wall on the backside of the house and dig up to 5 feet to expose the 3 inch water closet main drain and we will re...
HBL construction Loop. ETJ