Building Permits in ZIP 78731
Austin, TX — 519 permits filed recently
519 permits
Cap off Water and Waste Water
20 feet of 1-1/4 gas line replaced due to gas company finding leaks on old line Replaced 21 feet of gas from meter to where the gas enters the home Used ceiling plate4sd all thread every 4feetr to sus...
Replacement of complete existing central heat and air system with or without duct work
BLDG 2: New construction of a 1-story studio residence 1 bath.
New construction - new single family residence with attached garage and new driveway. There is an expired permit to replace water service the scope under the expired permit will have to be wrapped up...
Interior remodel garage conversion to gym and mudroom windows and door on east elevation.
Install a DCA backflow device and new irrigation system
Interior Remodel Turn desk into wet bar/kitchenette: Add sink connect to existing plumbing. Add two GFCI circuits for outlets relocate circuit with GFCI for microwave. Replace cabinets. No structural...
Construct new driveway approach of 10 FT. No sidewalk inspection per plan review.
addition to expand existing main bedroom kitchen remodel 4/6/26 SM - Revised: Full interior remodel with the attached garaged/ utility room to be demolished and rebuilt out of AE easement. Second floo...
Interior Remodel Kitchen & hall bath remodel
New construction single family residential 2-story 4 bedroom 3 bath with habitable attic attached 1-car carport attached 1-car garage covered front wood deck/ porch and covered rear patio.
Replacement of an existing water heater replacing the old tank gas water heater with a newer similar model.
Replacement of complete existing central heat and air system with or without duct work
PHASE 4 for TCO-L1: IL unit expansion & bridge courtyard & garage renovations + L2: IL unit expansion & bridge Chapel & Fitness renovation + L3: IL Unit expansion and bridge 6605 total SF Phase 4
New spa inside existing pool New concrete sundeck Adding concrete steps and landing
Express- Replacing all drywall and electric (a family of raccoons ate interior wiring; need to pull all drywall out to determine full extent of damage).
Phase 2 for TCO-L1: Courtyard & Elevator Lobby renovation + L2: Resd unit construction + L3 Clubhouse & Deck Renovation: total renovation sqft (7301) + total new construction sqft (6105) = 13406 total...
PHASE 3 for TCO - Corridor enclosure renovation (L1) music & corridor renovation (L2) lounge renovation (L3): 3167 renovasion sqft; new common area expansion @ existing open garage (L1) new conservato...
Replace 200A Service Meter. Underground Service. Home is occupied. Also replacing main service panel. contact - Bert 214-566-4319