Building Permits in ZIP 78702
Austin, TX — 493 permits filed recently
493 permits
Gas Leak Repair
2026/03/13 - 2026/03/14 | 2 day public event with panels sponsor activations and live music #SFS
New in-ground gunite pool
Install irrigation system
Bldg #2 New 2-story dwelling unit 1 bed/2 bath with storage covered patio and deck
Total demo of ADU 180 sq.ft.
Installation of underground fireline ref sp 2024-0478
Total demo of SFR 768 sqft Circa 1952
ePlan: Expedited Review - Remodel of existing Residential Structures Bldg 7 (1696 SF).
Install irrigation system
ePlan: Commercial Expedited Review - [APPROVED] First Time Finish Out for Level 1 - 5 PHASE 4 (79388 SF). ****SERVICE INFO-NO ESPA/SERVICE INSPECTIONS SHOULD BE DONE ON THIS PERMIT. PHASE 4 SERVICES A...
Installing 3 Split HVAC Units for Existing Office Building
New tenant infill for personal training facility in three story multi use building. existing space has fire rated ceiling assembly to remain. Adding gypsum board to two existing walls. Adding accessib...
ePlan: Residential Expedited Review - New construction of a TWO-UNIT RES. Bldg 1 2-Story SF Res [3bed 2.5bath] with attached Garage.
ePlan: Commercial Expedited Review - [APPROVED] First Time Finish Out for Level 1 - 5 PHASE 5 (69517 SF). ********SERVICE INFO-ESPA/INSPECTIONS FOR PHASE 5 MB1 AND HP5 ONLY SHOULD BE ATTACHED TO THIS...
ePlan: Commercial Expedited Review - [APPROVED] New Parking Garage (178517 SF). ****NO ESPA OR SERVICE INFORMATION/INSPECTIONS TO BE DONE ON THIS PERMIT-HYATT****
ePlan: Commercial Expedited Review - [APPROVED] First Time Finish Out- 5 PHASE 1 MULTIFAMILY FLOORS 1-5 CLUB AMENTITY TO INCLUDE LEASING OFFICE LEARNING CENTER CLUBHOUSE FITNESS AND DAYCARE (82195 SF)...
ePlan: Commercial Expedited Review - [APPROVED][SMART HOUSING] First Time Finish Out for Level 1 - 5 PHASE 3 (70582 SF). ****SERVICE INFO-ESPA/INSPECTIONS FOR PHASE 3 MB1 AND HP3 AND PHASE 4 MB1 MB2 A...
ePlan: Residential Expedited Review - New construction of a TWO-UNIT RES. Bldg 2 2-Story SF Res [4bed 3bath] with attached Garage
Installing 3 Split HVAC Units for Existing Office Building