Building Permits in ZIP 60610
Chicago, IL — 124 permits filed recently
124 permits
Wreck and remove a 2 story frame coach house (rear only)
For permit 101061408: replacement general contractor. new contractor(s) listed under "other applicants and contractors" on permit certificate.
Electrical maintenance permit. occupancy: education. start date: 3/7/2026. end date: 4/6/2026. all work under this permit must be performed by employees of the listed electrical contractor. the electr...
Concrete masonry repair / replacemnt: 100sq. ft., excavation = . location: out door patio waterproofing repairs.
Electrical maintenance permit. occupancy: education. start date: 3/7/2026. end date: 4/6/2026. all work under this permit must be performed by employees of the listed electrical contractor. the electr...
Electrical maintenance permit. occupancy: utilty. start date: 3/7/2026. end date: 4/6/2026. all work under this permit must be performed by employees of the listed electrical contractor. the electrica...
Electrical maintenance permit. occupancy: education. start date: 3/7/2026. end date: 4/6/2026. all work under this permit must be performed by employees of the listed electrical contractor. the electr...
Spr 2019 cbrc - proposed rooftop pergola w/trellis and retractable awning over an existing raised patio for an existing 2 story sfr, (occupancy class r-5, construction type iia) per plans.
Temporary scaffolding: qty: 2, max. length: 90 ft., max. height: 300 ft. location: perform facade repairs on the south elevation. permit expiration date: 365 days from permit issued date
Scope: roof replacement. area: 2000 sq. ft. roof covering: other. location: courtyard patio roof beneath deck. il roofing contractor license: 104020409.
Installation of one(1) 750lb capacity, vertical platform lift, pursuant t o the scope of work plans submitted.
Electrical maintenance permit. occupancy: utilty. start date: 3/7/2026. end date: 4/6/2026. all work under this permit must be performed by employees of the listed electrical contractor. the electrica...
Electrical maintenance permit. occupancy: utilty. start date: 3/7/2026. end date: 4/6/2026. all work under this permit must be performed by employees of the listed electrical contractor. the electrica...
Electrical maintenance permit. occupancy: utilty. start date: 3/7/2026. end date: 4/6/2026. all work under this permit must be performed by employees of the listed electrical contractor. the electrica...
Scope: nonstructural interior work: kitchen and bathroom remodel. washer and dryer installation (electric dryer-cord and plug connected, no venting., no gas connection, no electrical work). locations:...
Scope: nonstructural interior work: kitchen cabinet replacement, repair walls, floors in kitchen only (no electrical work, no plumbing work). locations: 1 residential unit(s), 0 non-residential unit(s...
Fire alarm: repair existing system. affects: 0 dwelling units; 1 non-residential units. high-rise building: yes. voice communication: no. special locking: no. monitoring type: supervising station . sp...
Concrete masonry repair / replacemnt: 1375sq. ft., excavation = no. location: all exterior facade elevations alt a not in scope.
Scope: nonstructural interior alterations including a new 100-amp electrical panel, new flooring, all new bathroom fixtures, all new kitchen cabinets with lighting. and a new stacked washer with an el...
Repair/replacement affecting 1 systems : 1 cooling tower(bac series v evaporative condenser vc1-205) . electrical work under this permit = no . locations: 0 residential unit(s), 0 non-residential unit...