Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 80 . lighting outlets: 472. specific location: corridors.
Fire alarm: modification of existing system. associated building permit:101074546. affects: 0 dwelling units; 1 non-residential units. high-rise building: yes. voice communication: no. special locking...
Electrical maintenance permit. occupancy: business. start date: 1/30/2026. end date: 3/1/2026. all work under this permit must be performed by employees of the listed electrical contractor. the electr...
Concrete masonry repair / replacemnt: 4787sq. ft., excavation = no. location: basement garage.
Fire alarm: new system. associated building permit:b200455510. affects: 0 dwelling units; 1 non-residential units. high-rise building: no. voice communication: no. special locking: yes. monitoring typ...
Electrical maintenance permit. occupancy: business. start date: 2/1/2026. end date: 3/3/2026. all work under this permit must be performed by employees of the listed electrical contractor. the electri...
Nonstructural interior replacement of water/smoke/fire damages to include 3000 sq ft drywall, plumbing fixtures and associated piping, electrical and ductwork. replace studs as needed at 1st and 2nd f...
Wreck and remove a six story masonry commercial office building
Electrical maintenance permit. occupancy: business. start date: 2/1/2026. end date: 3/3/2026. all work under this permit must be performed by employees of the listed electrical contractor. the electri...
Temporary scaffolding: qty: 1, max. length: 40 ft., max. height: 90 ft. location: northeast facade. permit expiration date: 365 days from permit issued date this permit is not valid without correspond...
Replacement of door operator on one(1) 2500lb capacity, 23-floor, 500fpm, passenger elevator(#6), pursuant to the scope of work submitted.(ev004209)
Low voltage/communication electrical work. install data/video. specific location: first and second floor.
Line voltage electrical work. new permanent 200 amp service disconnecting means with 30 circuits. receptacle outlets: 2 . lighting outlets: 2. specific location: basement.
New temporary electrical switchgear box and comed temporary transformer for construction site power. service voltage 480y/277 3 phase 4 wire and service capacity of 2000 amps and 9 circuits.