Building Permits in ZIP 19130
Philadelphia, PA — 223 permits filed recently
223 permits
Change of Use - Personal Services
Addition and/or Alteration - FOR LEVEL II ALTERATIONS TO 4TH FLOOR IN AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE PARTIAL DEMOLITION AND THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS...
Parking Only - FOR CREATE OF FORTY-FIVE (45) NON-ACCESSORY INTERIOR PARKING SPACES (INCLUDING TWO (2) ACCESSIBLE SPACES, ONE (1) OF WHICH IS VAN ACCESSIBLE AND FIVE (5) BICYCLE PARKING SPACE ON AN ACC...
Addition and/or Alteration - Fishing wires for baseboard heater and new electric stove
Addition and/or Alteration - FOR REPAIR/RENOVATION TO EXTERIOR FACADE PER APPROVED PLANS.
Addition and/or Alteration - Remove existing 110V receptacle and install GFCI receptacle in its place. install wire mold and box where needed for new Hydration Station
Addition and/or Alterations - FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FO...
Addition and/or Alteration - For the reconstruction of interior stair and stair framing of an existing 3-story building use as single family dwelling. Must have minimum head clearance as per plan and...
Addition and/or Alterations - EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construct...
Addition and/or Alteration - Supply and install 6 - 6" LED recessed light fixtures to existing light switch on 2nd floor and 4 - 6" LED recessed light fixtures on 3rd floor with new light switch. Supp...
Addition and/or Alteration - DEMOLITION OF NON-LOAD BEARING PARTITION WALL WITHIN APT 842. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START O...
Addition and/or Alterations - FOR THE INSTALLATION OF DUCTLESS HVAC APPLIANCES AND BATHROOM AND CLOTHES DRYER EXHAUSTS THROUGHOUT FOUR (4) DWELLING UNITS AT THE 2ND THROUGH 3RD FLOORS AS PER APPROVED...
EZ Swimming Pool/Spa - For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the attached E...
Change of Use - Residential - Household Living - Multi-Family
Addition and/or Alteration - Interior alteration including renovation of the kitchen and relocation of the powder room. Work to include: relocation of nonbearing partitions, create new openings in mas...
Excavation - EXCAVATION WORK ASSOCIATED WITH BUILDING FOUNDATION AND ADDITION WORK (SEE PERMITS SP-2025-001391 & CP-2025-006499) TO INCLUDE SHEETING AND SHORING AS PER APPROVED PLANS. *2018 IBC REVIEW...
New construction, addition, GFA change - FOR THE ERECTION OF ACCESSORY ROOF DECK ABOVE FIRST FLOORREAR, ROOF DECK ACCESS FROM SECOND FLOOR REAR ALL AS PART OF AN EXISTING ATTACHED STRUCTURE. SIZE AND...
Certificate of Occupancy (CO) (may include LO) - FOR THE DOCUMENTATIONS OF A CERTIFICATE OF OCCUPANCY FOR RETAIL SALES-CONSUMER GOODS AND RETAIL SALES-FOOD, BEVERAGES, AND GROCERIES ON FIRST FLOOR OF...
New Construction - NEW CONSTRUCTION OF A FOUR (4) STORY BUILDING WITH CELLAR AND PRIVATE ROOF DECKS WITH PILOT HOUSES FOR USE AS TWELVE (12) DWELLING UNITS WITH ACCESSORY PARKING AS PER APPROVED PLANS...
Commercial Make Safe Permit - MAKE SAFE PERMIT- To address Violation CF-2024-112288 as per submitted plans, documents, and Engineer's report to repair / replace the fire damaged roof, floor joist and...