Building Permits in ZIP 19123
Philadelphia, PA — 247 permits filed recently
247 permits
Addition and/or Alterations - INSTALL NEW FIRE SUPPRESSION SYSTEM COMPLYING WITH NFPA 13R THROUGHOUT THE BUILDING TO INCLUDE 2" MAIN FIRE SERVICE LINE WITH A 2" WILKINS 95OXLT2 BACKFLOW PREVENTION ASS...
Addition and/or Alteration - FOR THE REMOVAL OF THE ILLEGAL ADDITION AND SEALING OFF THE 2ND AND 3RD FLOORS. THE 2ND/3RD FLOOR ACCESS WILL BE RESTRICTED AND NO OCCUPANCY AS PER DEPARTMENT REGULATIONS(...
Solar Panels and Structure - FOR THE INSTALLATION OF ROOF MOUNTED SOLAR PANELS IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTAC...
Change of Use - Residential - Household Living - Single-Family; Unity of Use
Addition and/or Alteration - Interior alteration including lighting, wiring devices and refrigeration equipment. All work to be done according to the 2017 NEC and per approved plans.
Minor Demolition - FOR THE COMPLETE DEMOLITION OF EXISTING STRUCTURES. STRUCTURES TO BE DEMOLISHED BY HAND-HELD EQUIPMENT ONLY PER APPROVED PLANS. PEDESTRIAN PROTECTION TO BE IN PLACE PRIOR TO START O...
Addition and/or Alterations - FOR THE INSTALLATION OF NEW GRDs AND ASSOCIATED DUCTWORK AS PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IMC. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. SEE CP...
Addition and/or Alterations - FOR THE INSTALLATION OF NEW GRDs AND ASSOCIATED DUCTWORK AS PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IMC. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. SEE CP...
Change of Use - Personal Services
New Construction - FOR THE INSTALLATION OF AN AUTOMATIC FIRE SUPPRESSION SYSTEM IN ACCORDANCE WITH NFPA 13D THROUGHOUT THREE STORY BUILDING TO INCLUDE 1-INCH COMBINED WATER SERVICE LINE AS PER APPROVE...
Addition and/or Alteration - Install floor receptacles, install lights, outlets, and horns/strobes for the meeting room space. PER APPROVED DRAWINGS-2017 NEC.
New Construction - FOR THE INSTALLATION OF AN AUTOMATIC FIRE SUPPRESSION SYSTEM IN ACCORDANCE WITH NFPA 13D THROUGHOUT THREE STORY BUILDING TO INCLUDE 1-INCH COMBINED WATER SERVICE LINE AS PER APPROVE...
Excavation - Site / Utility Permit for CP-2025-001413
Full Demolition - Complete demolition to create vacant lot
Addition and/or Alteration - FOR LEVEL II INTERIOR ALTERATIONS WITHOUT A CHANGE IN USE AND OCCUPANCY CLASSIFICATION TO AN EXISTING GROUP M RETAIL GROCERY STORE. BUILDING IS FULLY SPRINKLERED. ALL WORK...
Addition and/or Alteration - FOR ACCESSIBILITY ALTERATIONS ONLY TO REMOVE AND REPLACE ONE (1) EXISTING INTERIOR STAIR CHAIR LIFT AND TO INSTALL ONE (1) NEW INTERIOR STAIR CHAIR LIFT AS PER APPROVED PL...
Addition and/or Alteration - Install switch, switch control wire customer provided light fixture or iTech provided recessed light 4th fl bathroom: (1) exhaust fan, (1) recessed light, (1) vanity light...
EZ Roof Covering Replacement - For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the at...
Addition and/or Alterations - INSTALLATION OF AN AUTOMATIC FIRE SUPPRESSION SYSTEM IN ACCORDANCE WITH NFPA 13 WITH A FIRE DEPARTMENT CONNECTION, BACKKFLOW PREVENTION DEVICE AND 2" SERVICE LINE, THROUG...
Alterations - SEAL LATERAL FOR DEMOLITION.