Building Permits in ZIP 19121
Philadelphia, PA — 373 permits filed recently
373 permits
New Construction - Mechanical / Fuel Gas Permit for combo RP-2025-010277
New Construction - Mechanical / Fuel Gas Permit for combo RP-2025-009725
Addition and/or Alteration - REWIRE COMPLETE 2 STORY - 200 AMP SERVICE (Fishing only)
New Construction - Mechanical / Fuel Gas Permit for combo RP-2025-009723
New Construction - Mechanical / Fuel Gas Permit for combo RP-2025-008691
New Construction - Mechanical / Fuel Gas Permit for combo RP-2025-010278
New Construction - Mechanical / Fuel Gas Permit for combo RP-2025-012454
Addition and/or Alteration - For interior and exterior alterations to an existing attached single-family dwelling per plans. Separate permits are required for all associated Mechanical, Electrical, an...
Addition and/or Alteration - INSTALLATION OF ROOFTOP MOUNTED 12.15 KW SOLAR PHOTOVOLTAIC PV SYSTEM ACCORDING TO THE 2017 NEC AND PER APPROVED PLANS.
Addition and/or Alteration - INSTALLATION OF ROOFTOP MOUNTED 16.2 KW SOLAR PHOTOVOLTAIC PV SYSTEM ACCORDING TO THE 2017 NEC AND PER APPROVED PLANS.
Addition and/or Alteration - INSTALLING 100AMP PANEL BOARD COMPLETE. INSTALLING (5) 15/20 AMP CIRCUITS TO 2ND FLOOR BATHROOM FOR LIGHTING,HEATER, WASHER, & GFCI RECEPTACLE. (ALL FISHED & SURFACE MOUNT...
Addition and/or Alteration - - For alterations to an Existing One Family Dwelling as per attached standard. Deviations from this standard will result in permit revocation and require submission of con...
Addition and/or Alteration - Replace smoke detectors, horn/strobes, pull stations and emergency lighting. Replacement of devices only. No fire alarm panel or wiring to be done.
Addition and/or Alteration - Electrical Permit for combo RP-2025-001980
EZ Bathroom & Kitchen Remodel - Replace tub, toilet, lavatory and underfloor piping
Alterations - INSTALL (2) 3 PC BATH & (1) KITCHEN. 7 FIXTURES.
New construction, addition, GFA change - FOR THE ERECTION OF A VERTICAL ADDITION TO AN EXISTING ATTACHED STRUCTURE. SIZE AND LOCATION AS SHOWN IN APPLICATION/PLANS
Addition and/or Alteration - Rough wire and finish, single-family home, and 200-amp service
Solar Panels and Structure - FOR THE INSTALLATION OF RESIDENTIAL ROOF MOUNTED SOLAR PANELS AND RELATED APPURTENANCES AS NOTED ON THE APPROVED PLANS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CO...
New Construction - FOR THE CONSTRUCTION OF A SEMI-DETACHED STRUCTURE WITH CRAWL SPACE. FOR USE AS A SINGLE-FAMILY HOUSEHOLD LIVING. AS PER APPROVED PLANS. *************SEPARATE PLUMBING, ELECTRICAL AN...