Building Permits in ZIP 11235
Brooklyn, NY — 406 permits filed recently
406 permits
Install new h.w.h., boiler, bathroom and kitchen fixtures in the existing 2 story building. plumbing works as per plan. no change in egress, use, or occupancy.
Installation of pipe scaffold for is 14k at 2424 batchelder street, brooklyn as indicated on plans. there will be no change in the use, egress, or occupancy under this application.
First and second story, rear enlargement to an existing residential building
Installation of temporary construction fence for is 14k at 2424 batchelder street, brooklyn as indicated on plans. there will be no change in the use, egress, or occupancy under this application.
Installation of temporary wood construction fence as per mea#279-895
Installation of pipe scaffold for is 14k at 2424 batchelder street, brooklyn as indicated on plans. there will be no change in the use, egress, or occupancy under this application.
Installation of temporary wood construction fence as per mea#279-895
Install new h.w.h., boiler, bathroom and kitchen fixtures in the existing 2 story building. plumbing works as per plan. no change in egress, use, or occupancy.
First and second story, rear enlargement to an existing residential building
Installation of temporary construction fence for is 14k at 2424 batchelder street, brooklyn as indicated on plans. there will be no change in the use, egress, or occupancy under this application.
Proposed application hereby filed for replacement of gas fired equipment on existing gas piping no change in use or occupancy to be proposed under this application
cut/remove portion of a shed at rear yard to comply with code.
cut/remove portion of a shed at rear yard to comply with code.
Proposed Plumbing Work, relocate bathroom, create ADA bathroom, add sinks.
Proposed Plumbing Work, relocate bathroom, create ADA bathroom, add sinks.
Garage restoration as per plans
Create opening at side wall as per plans
proposing construction equipment fence
Support of excavation drawings for the installation of the new foundation system for the rear extension
Installation of temporary roof protection as per plans. no change in use, egress or occupancy.