Building Permits in ZIP 11233
Brooklyn, NY — 405 permits filed recently
405 permits
Work shall include direct replacement of finishes direct replacement of apartment kitchen, bathrooms, doors and window sashes.
Work shall include direct replacement of finishes direct replacement of apartment kitchen, bathrooms, doors and window sashes. additional ground level hardscape repairs and improvements as needed per...
Work shall include direct replacement of finishes direct replacement of apartment kitchen, bathrooms, doors and window sashes. additional ground level hardscape repairs and improvements as needed per...
Work shall include direct replacement of finishes direct replacement of apartment kitchen, bathrooms, doors and window sashes.
Project is a full program accessibility project which includes a new 4 story plus basement elevator addition, to provide access to the school at all floor levels. Additional scope includes bathroom up...
Project is a full program accessibility project which includes a new 4 story plus basement elevator addition, to provide access to the school at all floor levels. Additional scope includes bathroom up...
Interior renovation in exisg 3-story res building with bsmt&cel.resolve landmark vio#vio-16-0887, #vio-16-0888, dob vio#112719aeuhaz100532, ecb violations#35433108n,#35516218h,#35519099h,#35523592n,&#...
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Interior renovation in exisg 3-story res building with bsmt&cel.resolve landmark vio#vio-16-0887, #vio-16-0888, dob vio#112719aeuhaz100532, ecb violations#35433108n,#35516218h,#35519099h,#35523592n,&#...
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Application filed to install new ductwork and new kitchen exhaust fanas per plans. fire suppression system filed separately with thefdny. no change to use, egress, or occupancy.
Underground plumbing specifications filed in conjunction with nb application 340803045
Rehabilitation of commercial space, including patching and painting, and replacement of cooking equipment.
Application filed to install new ductwork and new kitchen exhaust fanas per plans. fire suppression system filed separately with thefdny. no change to use, egress, or occupancy.
Rehabilitation of commercial space, including patching and painting, and replacement of cooking equipment.
Underground plumbing specifications filed in conjunction with nb application 340803045
k12: Remove & replace Brinck and Masonry Works, Door and Window Replacement including Window Guards, Remove & replace Parapet walls, Roofing and As-Built Roofing, Reflashing of Roof Curves, Repair & R...
K012: Replacement of Exhaust fans and Split System Heat Pump Ductless Unit and associated duct work.
New security lighting installation on 1st floor & also on the roof top parapets. This amendment is filed to change the Asbestos Compliance to a Non Asbestos Building. See Comments. Building is built a...
Installation of temporary construction fence .