Building Permits in ZIP 11232
Brooklyn, NY — 246 permits filed recently
246 permits
This job is filed for full demolition work at 748 41Street, Brooklyn, NY 11232
Construction fence as per plans
Filing for temporary scaffolding.
Resolve ecb violation: 35679394n; remove (1)3-pc bathroom in basement; no change in use, egress or occupancy under this application.
Installation of New Mechanical equipment on partial 4th floor - suite C412. No Change in use, egress or occupancy
Resolve ecb violation: 35679394n; remove (1)3-pc bathroom in basement; no change in use, egress or occupancy under this application.
Installation of New Mechanical equipment on partial 4th floor - suite C412. No Change in use, egress or occupancy
Modified existing Sprinkler System on partial 4th floor - suite C412. No Change in use, egress or occupancy
Modified existing Sprinkler System on partial 4th floor - suite C412. No Change in use, egress or occupancy
Subsequent soe application filed herewith.
Mpp#000000297
Mpp#000000297
Subsequent soe application filed herewith.
Renovation of restrooms updating the fixtures and handicap stalls. Installation of new of urinal, mop sink, drinking fountain, floor drain, hand sink and water closet.
Installation of solar pv system. no change to use, egress, or occupancy.
Installation of solar pv system. no change to use, egress, or occupancy.
Equipment use: single 6000 # capacity personnel hoist during nb const, filed sep. hoist shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application. elevator a...
Equipment use: single 6000 # capacity personnel hoist during nb const, filed sep. hoist shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application. elevator a...
Tenant buildout of existing commercial space on the 6th floor including the installation of new floor & wall finishes as indicated on the drawings filed herein. no change in use, occupancy or egress u...
Tenant buildout of existing commercial space on the 6th floor including the installation of new floor & wall finishes as indicated on the drawings filed herein. no change in use, occupancy or egress u...