Building Permits in ZIP 11231
Brooklyn, NY — 591 permits filed recently
591 permits
Removal of ex. site pavt's, curb wall, and fence in conjuction with renovated playyard entrance ramp. provide new pavt's, curb wall, fencing and railings for ada compliant entrance ramp.
Installation of 300psf sidewalk shed as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under this application.
Filing herewith to PROVIDE ELECTRICAL CLOSET FOR RELOCATED EQUIPMENT., AN ELEVATED STEEL FRAMED BOILER ROOM,AND A NATURAL GAS OPTIONAL STANDBY POWER GENERATOR ON STEEL PLATFORM.
Remove and install plumbing fixtures.
Remove and install plumbing fixtures.
Filing herewith to PROVIDE ELECTRICAL CLOSET FOR RELOCATED EQUIPMENT., AN ELEVATED STEEL FRAMED BOILER ROOM,AND A NATURAL GAS OPTIONAL STANDBY POWER GENERATOR ON STEEL PLATFORM.
Masonry facade work, and sealant application as per plans. No change to use, egress, or occupancy.
Structural dunnage support for RTU on roof.
Installation of 300psf sidewalk shed and pipe scaffolding as per plans. all equipment shall comply with chapter #33 of the 2022 code no change in use, egress or occupancy under this application.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy or egress under this application.
Installation of 300psf sidewalk shed and pipe scaffolding as per plans. all equipment shall comply with chapter #33 of the 2022 code no change in use, egress or occupancy under this application.
Installation of a temporarily heavy-duty sidewalk shed, supported scaffold and needle beam per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or oc...
Perform minor interior partition demolition & construction inconjunction with conversion to two family dwelling. remove one kitchen, relocate kitchen from 3rd to 1st floor. remove roof hatch & ladder...
Installation of a temporarily heavy-duty sidewalk shed, supported scaffold and needle beam per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or oc...
Subsequent filing for structural work
Structural dunnage support for RTU on roof.
Perform minor interior partition demolition & construction inconjunction with conversion to two family dwelling. remove one kitchen, relocate kitchen from 3rd to 1st floor. remove roof hatch & ladder...
Subsequent filing for structural work
Masonry facade work, and sealant application as per plans. No change to use, egress, or occupancy.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy or egress under this application.