Building Permits in ZIP 11229
Brooklyn, NY — 320 permits filed recently
320 permits
Installation of 4 new fixtures on the 2nd floor.
Erect an illuminated business accessory wall sign. no change in use, egress, or occupancy.
Erect an illuminated business accessory wall sign. no change in use, egress, or occupancy.
Install new marquee as per plans filed. No change in use, egress or occupancy.
Filing for the installation of two 12-Ton Heat Pump Systems. No change in use, egress or occupancy.
Renovate cellar, 1st & 2nd floor for an existing 2 story, 2 families house. new partition, door, flooring & cosmetic work as per plan submitted. plumbing work to be filed subsequence b01333387-s1. no...
Erect a non-illuminated business accessory wall sign. no change in use, egress, or occupancy.
The purpose of this project is to legalize the front porch enclosure and extend the porch in the front yard. no change to egress, occupancy, or use.
Horizontal enlargement of existing 1 family home
Horizontal enlargement of existing 1 family home
Filing for the installation of two 12-Ton Heat Pump Systems. No change in use, egress or occupancy.
Install new marquee as per plans filed. No change in use, egress or occupancy.
Renovate cellar, 1st & 2nd floor for an existing 2 story, 2 families house. new partition, door, flooring & cosmetic work as per plan submitted. plumbing work to be filed subsequence b01333387-s1. no...
Submit temporary construction fence at open space, no change in use, egress or occupancy.
Replacement of 14 existing roof drains in place as part of roof replacement. The relocation of 5 roof drains away from the wall. All roof drain piping removed and replaced to the first elbow.
Replacement of 14 existing roof drains in place as part of roof replacement. The relocation of 5 roof drains away from the wall. All roof drain piping removed and replaced to the first elbow.
Submit temporary construction fence at open space, no change in use, egress or occupancy.
The scope of work consists of installing new toilets, sinks, water lines and gas line for commercial kitchen.
Mechanical means submitted for use of mechanical equipment on grade at the time of demolition
Rebalance existing RTU to 350 CFM/Ton per new walgreens UDS