Building Permits in ZIP 11228
Brooklyn, NY — 189 permits filed recently
189 permits
Renovation of existing basement, 1st and 2nd floor with general construction: new partitions, doors, flooring and cosmetic work; replace concrete stair at rear yard. no change in use, egress or occupa...
Plumbing work on cel, 1st & 2nd floor in conjunction with alt-co application.
Alteration type 2 application filed for proposed modification of existing plumbing system for the cellar and basement space. one (1) new toilet, one (1) lav sink, and one (1) sink are added. no change...
Resolve ecb violation: 39100754h; to remove illegal awning at storefront as per plan. no change in use, egress or occupancy under this application
Plumbing work on cel, 1st & 2nd floor in conjunction with alt-co application.
Resolve ecb violation: 39100754h; to remove illegal awning at storefront as per plan. no change in use, egress or occupancy under this application
Alteration type 2 application filed for proposed modification of existing plumbing system for the cellar and basement space. one (1) new toilet, one (1) lav sink, and one (1) sink are added. no change...
Cellar residential storage and 1st floor retail extension of existing mix used building. obtain new c of o.
Cellar residential storage and 1st floor retail extension of existing mix used building. obtain new c of o.
General construction work in 2-family building with remove door, partition, new/repair partition, ceiling, floor, door and painting as per plan and mechanical work with install new split a.c. no chang...
Renovation of existing cellar, 1st and 2nd floor with plumbing work:relocate kitchen and bathroom fixtures; new 2-pc restroom, washer, dryer,and combined boilers in cellar; no change in use, egress or...
File plumbing work for 2-family building with new/replace/relocated plumbing fixtures and gas appliances as per plan. no change of use, egress, or certificate of occupancy.
File plumbing work for 2-family building with new/replace/relocated plumbing fixtures and gas appliances as per plan. no change of use, egress, or certificate of occupancy.
General construction work in 2-family building with remove door, partition, new/repair partition, ceiling, floor, door and painting as per plan and mechanical work with install new split a.c. no chang...
Renovation of existing cellar, 1st and 2nd floor with plumbing work:relocate kitchen and bathroom fixtures; new 2-pc restroom, washer, dryer,and combined boilers in cellar; no change in use, egress or...
Abandon 20,000 gallon fuel oil tank.
General construction work in 2-family building with remove door, partition, new/repair partition, ceiling, floor, door and painting as per plan and mechanical work with install new split a.c. no chang...
Abandon 20,000 gallon fuel oil tank.
Renovation of existing cellar, 1st and 2nd floor with general construction: new partitions, doors, flooring and cosmetic work; replace concrete stair at rear yard. no change in use, egress or occupanc...
Renovation of existing basement and 1st floor with general construction:new partitions, doors, flooring and cosmetic work; no change in use,egress or occupancy under this application.