Building Permits in ZIP 11226
Brooklyn, NY — 382 permits filed recently
382 permits
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this application.
Installation of 300 psf sidewalk shed and overhead protection as per plans. all equipment shall comply with chapter #33 of the 2014 code. no change in use, egress or occupancy under this application.
Mechanical work on 1st, 2nd, 3rd floor & roof. no change in egress, use or occupancy.
Installation of 300 psf sidewalk shed and overhead protection as per plans. all equipment shall comply with chapter #33 of the 2014 code. no change in use, egress or occupancy under this application.
Mechanical work on 1st, 2nd, 3rd floor & roof. no change in egress, use or occupancy.
Installation of solar pv system. no change to use, egress, or occupancy.
Full chiller replacement. no change in use or occupancy.
Installation of pipe scaffolding as per plans. all equipment shall comply with chapter # 33 of the 2022 code. no change in use occupancy or egress under this application.
Full chiller replacement. no change in use or occupancy.
Installation of solar pv system. no change to use, egress, or occupancy.
Installation of pipe scaffolding as per plans. all equipment shall comply with chapter # 33 of the 2022 code. no change in use occupancy or egress under this application.
Plumbing application for a renovated (2) two family dwelling,filed in conjunction with alt ii application # b01267754-i1 install new plumbing fixtures as per plan
Provide 8' high plywood construction green fence. No change in egress, use and occupancy.
Decommission of existing tmo site. remove equipment platform and dunnage, 9 antennas, 6 rrh and 1 gps from roof. remove cables from basement facade and roof. no change in use, egress or occupancy. ori...
Renovation of existing commercial space in 1st floor and cellar with plumbing work as per plan. no change in use, egress or occupancy under this application.
Interior renovation on 1st and 3rd floors apt 1c & 3c, and change existing apartment number from 3b to 3c; and relocating entry door as per plan. plumbing work will be filed subsequently with this app...
Existing (1) 4.5 ton split system and ceiling exhaust restroom fans to remain. New (1) 3 ton split system along with new ductwork proposed.
Renovation of existing commercial space in 1st floor and cellar with plumbing work as per plan. no change in use, egress or occupancy under this application.
Decommission of existing tmo site. remove equipment platform and dunnage, 9 antennas, 6 rrh and 1 gps from roof. remove cables from basement facade and roof. no change in use, egress or occupancy. ori...
Provide 8' high plywood construction green fence. No change in egress, use and occupancy.