Building Permits in ZIP 11225
Brooklyn, NY — 270 permits filed recently
270 permits
Proposed Structural scope to replace and repair damaged tiles and substrate structure of existing raised floor system at sever room B43 caused by the removal of 3-existing CRAC units. All as per Plans...
Proposed replacement of existing Computer Room Air Conditionings (CRAC) units serving Academic Building 1, of the following CRAC Units:CRAC-6, CRAC-7,CRAC-8,ACC-3.. All as per Plans filed herewith. No...
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Alt co filing to convert 1st floor ug 4 daycare to ug vi yoga studio. renovate 2nd and 3rd floor residential units.
Interior renovation of existing single family dwelling no change to use, bulk, egress, or occupancy
provide a new split system ductless unit for MDF room. 3 AC-split type indoor ductless indoor units for the 4th floor. 1 new spilt type vrf heat pump unit ACCU-R.4 on the roof # 1,
Installation of community facility plumbing fixtures, residential plumbing fixtures and residential gas equipment. installation of (3) new navien tankless water heaters in cellar. installation of (2)...
Medgar Evers College, Carroll St Bldg, Exterior Parking Lot Sinkhole Repairs: Partial removal & replacement of parking lot concrete slab and asphalt. Excavation and disposal of 5' of soil below slab a...
Proposed horizontal enlargement at rear of secondfloor and interior renovations to an existing three story single family dwelling. no change in use, egress and occupancy.
provide a new split system ductless unit for MDF room. 3 AC-split type indoor ductless indoor units for the 4th floor. 1 new spilt type vrf heat pump unit ACCU-R.4 on the roof # 1,
Installation of community facility plumbing fixtures, residential plumbing fixtures and residential gas equipment. installation of (3) new navien tankless water heaters in cellar. installation of (2)...
Interior renovation of existing single family dwelling no change to use, bulk, egress, or occupancy
Medgar Evers College, Carroll St Bldg, Exterior Parking Lot Sinkhole Repairs: Partial removal & replacement of parking lot concrete slab and asphalt. Excavation and disposal of 5' of soil below slab a...
Proposed horizontal enlargement at rear of secondfloor and interior renovations to an existing three story single family dwelling. no change in use, egress and occupancy.
Install exterior illuminated wall sign (dunkin')
Install exterior illuminated wall sign (dunkin')
Heavy duty sidewalk shed as per emergency declaration. sidewalk shed shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Filing for general construction to repair fire damage at apt# 2r and 3r. no change to egress,use, or occupancy.
Filing for general construction to repair fire damage at apt# 2r and 3r. no change to egress,use, or occupancy.
Install exterior illuminated wall sign (dunkin')