Building Permits in ZIP 11223
Brooklyn, NY — 630 permits filed recently
630 permits
foundation work for 2 story single family house
Additions/modificaitions to existing plumbing system
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Install 1 new boilers, 1 hwh, 1 washer and 1 dryer in the existing 2 story building. replace kitchen and bathroom fixtures. plumbing work as per plan. no change in egress, use, or occupancy.
Renovation of existing 2nd floor with general construction: repainting wall, ceiling and resurface floor as per plan; no change in use, egress or occupancy under this application.
Mechanical application is filed in conjuction with gc job#b01225759-i1
Plumbing filed in conjuction with gc job#b01225759-i1
structural filing for 2 story single family house
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Provide new RTU & associated controls, ductwork & accessories.
Resolve ecb violation: 35362555j; remove illegal partition wall, doors and restore back to legal condition as per plan. new 2-pc restroom in cellar. no change in use, egress or occupancy under this ap...
Mechanical work as per plans filed
Installation of temporary pipe scaffold as per plans. no change in use, egress or occupancy.
Structural work showing changes made to the 6th floor and roof.
Mechanical work as per plans filed
Resolve ecb violation: 35362555j; remove illegal partition wall, doors and restore back to legal condition as per plan. new 2-pc restroom in cellar. no change in use, egress or occupancy under this ap...
Installation of temporary pipe scaffold as per plans. no change in use, egress or occupancy.
Structural work showing changes made to the 6th floor and roof.
Minor interior renovation to the first floor commercial store as per plan. no change in use, egress, or occupancy.