Building Permits in ZIP 11221
Brooklyn, NY — 616 permits filed recently
616 permits
Application filed to supersede application #310213934 filed for modification to existing sprinklers with existing residence.
application herewith filed for a vertical enlargement for new 3rd floor and a rear horizontal enlargement at rear of basement. Obtain new C.O.
Application filed for tenant fit out for educational facility at 2nd floor.
Nycha boiler - removal and replacement of vacuum pump unit, condensate return unit with mechanical piping and duct-work for interior renovation of mechanical equipment room.
Installation of rear yard shallow and new footing in basement
Interior renoviations to existing mechanical system per plans. no change in use egress or occupancy
Application filed to supersede application #310213934 filed for modification to existing sprinklers with existing residence.
Interior renovations as per lans filed hereiwht no cjange in use, egress or occupancy.
Replacement of existing gas piping & gas riser to existing gas appliances as per plan. new sprinkler & domestic water service. no change in building use, occupancy and/or egress.
Mechanical work filed in conjunction with ALTCO. Application filed to supersede B01051703-S4.
Submit curb cut work in conjunction with alt1 application #b01039899-i1, no change in use, egress or occupancy.
Proposed super structural work filing b01038125-s2 in conjunction with g/c filing #b01038125-i1
Support of Excavation filed subsequent to Alt-CO NB application: B01233168-S7.
Mechanical work filed for tenant fit out at 2nd floor.
Fence in conjunction to the application #B01264675-I1
Submit curb cut work in conjunction with alt1 application #b01039899-i1, no change in use, egress or occupancy.
Plumbing work of existing 3-story building as per plans filed herewith. related general construction work has been filed separately. no change in use, egress or certificate of occupancy.
Proposed super structural work filing b01038125-s2 in conjunction with g/c filing #b01038125-i1
Mechanical work filed for tenant fit out at 2nd floor.
Proposed plumbing work in conjunction to arch. designs. install plumbing fixtures and piping.