Building Permits in ZIP 11220
Brooklyn, NY — 545 permits filed recently
545 permits
Plumbing work on exist. residential house with cap/remove/replace/new kitchen and bathroom fixtures as per plan. no change in use, egress or occupancy.
interior & exterior renovation of exist. building with repair ceiling, replace floor, stair, new partition, door, painting, and install new AC units work, no change in use, egress or occupancy.
Proposed change of building's use from the existing two dweling units and one commercial unit to the proposed one dwelling unit and one commercial unit. work involves new interior partitions. a new ce...
General renovation of an existing 3 story 2-family building with repair/replace/new partition, door, ceiling, floor, painting work as per plan. no change in use, egress or occupancy.
interior & exterior renovation of exist. building with repair ceiling, replace floor, stair, new partition, door, painting, and install new AC units work, no change in use, egress or occupancy.
Renovation of exist. residential house, repair/replace/new partition, door, ceiling, floor, stair, painting, canopy, roof as per plan. no change in use, egress or occupancy.
SUBSEQUENCE PLUMBING & SPRINKLER WORK IN-CONJUNCTION WITH DOBNow GC JOB#: B01109372-I1. INSTALL NEW PLUMBING & SPRINKLER FIXTURES AS PER PLAN SUBMITTED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
interior & exterior renovation of exist. building with repair ceiling, replace floor, stair, new partition, door, painting, and install new AC units work, no change in use, egress or occupancy.
SUBSEQUENCE PLUMBING & SPRINKLER WORK IN-CONJUNCTION WITH DOBNow GC JOB#: B01109372-I1. INSTALL NEW PLUMBING & SPRINKLER FIXTURES AS PER PLAN SUBMITTED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
General renovation of an existing 3 story 2-family building with repair/replace/new partition, door, ceiling, floor, painting work as per plan. no change in use, egress or occupancy.
Proposed change of building's use from the existing two dweling units and one commercial unit to the proposed one dwelling unit and one commercial unit. work involves new interior partitions. a new ce...
Renovation of exist. residential house, repair/replace/new partition, door, ceiling, floor, stair, painting, canopy, roof as per plan. no change in use, egress or occupancy.
Install new commercial kitchen plumbing fixtures and gas equipment in 1st floor of the existing 3 story building. plumbing works as per plan. no change in egress, use, or occupancy.
In conjunction with alt job 301770215. install ductless split-system heat pump unit for commercial space at 814 & 816a, install refrigeration condenser unit for walk-in cooler at 816a
Proposed installation of debris chute as per plans. chute shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this application.
Modification to Verizon site. Remove 2 antennas, replace 2 antennas, install 7 antennas, remove 4 RRH units, relocate 2 GPS antennas and install 2 GPS antennas, remove cabinet, install new platform wi...
Provide Five story School with Cellar including new water services sanitary, vent, and storm piping systems. Cellar is provided with sewage ejector.
1. this application is filed to cure the 2 ecb violations issued 08/15/2025, namely: doing work without a permit, framing/replacing partitions, and general renovation on cel, 1st, 2nd and attic floors...
1. this application is filed to cure the 2 ecb violations issued 08/15/2025, namely: doing work without a permit, framing/replacing partitions, and general renovation on cel, 1st, 2nd and attic floors...
Modification to Verizon site. Remove 2 antennas, replace 2 antennas, install 7 antennas, remove 4 RRH units, relocate 2 GPS antennas and install 2 GPS antennas, remove cabinet, install new platform wi...