Building Permits in ZIP 11220
Brooklyn, NY — 545 permits filed recently
545 permits
File plumbing work with installation of new plumbing fixtures and gas appliances as per plan in conjunction with construction on file. no change in use, egress or occupancy.
Retro-commissioning of existing heating system, repair of baseboard radiators replacement of baseboard radiators, installation of insulation on existing piping, replacement of exhaust fans. no change...
Filing to install non-illuminated aluminum awning on wall for first floor commercial space. no change to use, egress or occupancy.
Proposed structural work for horizontal and vertical enlargement on a 2 story building, in conjunction with alt1 application b08027258-i1.
Proposed structural and foundation works for a (6) stories with penthouse mix-use building structural steel frame with cmu wall construction.
4 story horizontal and vertical extension on exising two story building , total 6 storymixed use building , obtain new certificate of occupancy .
Mechanical modifications on 3rd floor as shown on plans filed herewith, No change in egress, occupancy, or use.
Retro-commissioning of existing heating system, repair/replacement of baseboard radiators, installation of insulation on existing piping. no change in use, occupancy and egress.
General construction consisting of roof and window replacement, insulation at exterior walls along with interior renovations as per plans filed herewith. No change to use, egress or occupancy
Applic. filed to install new handicapped toilet plumbing fixtures & piping at 001 for existing Retail or Service Establishment. General Construction work for new handicapped toilet filed under Alt # B...
Structural repairs to include crack reparis and repairs to roof and railings
Plumbing modifications on 6th floor as shown on plans filed herewith. No change in egress, occupancy, or use.
Structural repairs to include facade pinning, crack repairs, brick replacement, new railing and new concrete slab as per plans filed herewith. No change to use, egress or occupancy
Installation of two (2) new rooftop hvac units that connect to the existing supply / return infrastructure. there is a new fitout level air distribution network on level 4, which includes supply / ret...
Installation of 104.72 kw solar energy system on roof. No change of occupancy, use or egress.
Install new construction wood fence at open space only.
File plumbing work with installation of new plumbing fixtures and gas appliances as per plan in conjunction with construction on file. no change in use, egress or occupancy.
4 story horizontal and vertical extension on exising two story building , total 6 storymixed use building , obtain new certificate of occupancy .
Structural repairs to include facade pinning, crack repairs, brick replacement, new railing and new concrete slab as per plans filed herewith. No change to use, egress or occupancy
Filing to install non-illuminated aluminum awning on wall for first floor commercial space. no change to use, egress or occupancy.