Building Permits in ZIP 11218
Brooklyn, NY — 374 permits filed recently
374 permits
Filing stuctural plans in conjunction with gc job #b00887657-i1
Proposed Structural Work in Conjunction with NB #B00712067-I1
Proposed alteration to existing (3) three story dwelling to alter to a five (5) story, five (5) family dwelling with existing foundations to remain as per plans filed herewith
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or...
Installation of temporary roof protection as per plans. no change in use, egress or occupancy. shall comply with chapter#33 of 2022 nyc building code.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
2nd floor renovation as per plan.
Proposed installation of temporary pipe scaffold for new building as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this applicati...
Proposed bathroom renovation: existing tub to be converted to shower on new plumbing rough-in, vanity and toilet to be replaced on existing rough-in; existing kitchen sink and gas tove to be replaced...
Proposed bathroom renovation: existing tub to be converted to shower on new plumbing rough-in, vanity and toilet to be replaced on existing rough-in; existing kitchen sink and gas tove to be replaced...
2nd floor renovation as per plan.
Filing stuctural plans in conjunction with gc job #b00887657-i1
Proposed Structural Work in Conjunction with NB #B00712067-I1
Installation of temporary roof protection as per plans. no change in use, egress or occupancy. shall comply with chapter#33 of 2022 nyc building code.
Proposed alteration to existing (3) three story dwelling to alter to a five (5) story, five (5) family dwelling with existing foundations to remain as per plans filed herewith
Install Temporary wood construction fence for demolition operations. No change to egress, occupancy or use.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or...
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Proposed installation of temporary pipe scaffold for new building as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this applicati...
Replacement of existing front brick steps and stood, side and rear wall siding, rear basement entrance concrete stairs and CMU wall repairs, waterproof and seal rear and side lower cellar level walls...