Building Permits in ZIP 11217
Brooklyn, NY — 787 permits filed recently
787 permits
Existing 2-Story and basement 2-Family building, to be enlarged horizontally and vertically to a 3-Story and basement 2, family building
Filing Foundation application subsequent to the primary application B00997529-I1
Herewith filing for the removal and installation of plumbing fixtures with related piping throughout, as per plans submitted.
Erect new 43 story building. Hub consultation held on 10.17.23. MPP project #349.
Remove existing shaft enclosure, seal opening in floor and ceiiling. new partitions and kitchen cabinets in apt 3g on the 3rd floor. no change in use, egress or occupancy.
Full demolition to a four story building
relocate 1 dw, 1 sink, replace 1 wc,, 1 tub, 1 lav, 1 new washer, 1 new wc, 1 new lav, 1 new shower, cap and remove 1 range
Temporary construction fence required for storefront replacement work.
This application is for interior renovation tocellar, basement, first, second & third floors with minor changesto the rear facade openings at basement & first floor and openporch. there shall be no ch...
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Herewith filing for the removal and installation of plumbing fixtures with related piping throughout, as per plans submitted.
Full demolition to a four story building
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Temporary construction fence required for storefront replacement work.
Erect new 43 story building. Hub consultation held on 10.17.23. MPP project #349.
relocate 1 dw, 1 sink, replace 1 wc,, 1 tub, 1 lav, 1 new washer, 1 new wc, 1 new lav, 1 new shower, cap and remove 1 range
This application is for interior renovation tocellar, basement, first, second & third floors with minor changesto the rear facade openings at basement & first floor and openporch. there shall be no ch...
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Construction of fence as per plans filed herewith. no change in use, egress and occupancy.
Construction of fence as per plans filed herewith. no change in use, egress and occupancy.