Building Permits in ZIP 11217
Brooklyn, NY — 785 permits filed recently
785 permits
Sprinkler work in conjunction with the renovation of the dwelling unit.
Sprinkler work in conjunction with the renovation of the dwelling unit.
Interior renovation of existing store with general construction and mechanical work as per plan filed. no change of use in egress or certificate of occupancy.
Relocate 1 dw, 1 sink, 1 wc, 1 lav, 2 new showers, 1 new wc, 1 new lav, 1 new washer
Illuminated non-advertising accessory wall sign - seafood restaurant & bar. no change of use, egress or occupancy.
Curb cut work as shown on plans in conjunction with NB # B00621061-I1.
Mechanical work as shown on plans in conjunction with NB # B00621061-I1.
Installation of plumbing system for retail fit out. No change in use, egress or occupancy.
Interior building renovations including apartment bathrooms, kitchens, common spaces, etc. as per plans filed herewith. No change to use, egress, or occupancy.
Interior building renovations including apartment bathrooms, kitchens, common spaces, etc. as per plans filed herewith. No change to use, egress, or occupancy.
Interior building renovations including apartment bathrooms, kitchens, common spaces, etc. as per plans filed herewith. No change to use, egress, or occupancy.
Installation of plumbing system for retail fit out. No change in use, egress or occupancy.
Mechanical work as shown on plans in conjunction with NB # B00621061-I1.
Interior building renovations including apartment bathrooms, kitchens, common spaces, etc. as per plans filed herewith. No change to use, egress, or occupancy.
Support of Excavation work in conjunction to the NB application B01249173-I1
Proposed plumbing work at partial 1st floor commercial space of eating and drinking establishment as per plan. No change in use, egress, or occupancy.
Interior renovation to 2 family dwelling. removal and installation of interior non-bearing partitions, fixtures, and finishes. no change to use, occupancy, or egress under this application.
Install of temp platform, scenic sculpture & prod equip, no alt to exist structures for H&M Bloom. TPA required. Producer is responsible to monitor site safety. All production equipment removed upon e...
Install of temp platform, scenic sculpture & prod equip, no alt to exist structures for Cult Gaia. TPA required. Producer is responsible to monitor site safety. All production equipment removed upon e...
Interior remodel of existing residential unit. Including new bathroom fixtures.