Building Permits in ZIP 11215
Brooklyn, NY — 990 permits filed recently
990 permits
Proposed new hvac system at roof and new mechanical ventilations in bathrooms and kitchens, no change of use, egress or occupancy.
Support of excavation design to facilitate proposed enlargement of existing building as per plans.
Installation of debris chute for ps 295k at 330 18 street, brooklyn as per indicated on plans. there will be no change in the use, egress, or occupancy under this application.
Renovations to existing 2-family dwelling. horizontal enlargement at 2nd floor as per plans filed herewith. no change in use, egress or occupancy
Mechanical system worktype in conjunction with nb application b01025424
Installation of pipe scaffolding as per plans. pipe scaffolding shall comply with chapter # 33 of the nyc code 2022, no changes in use egress or occupancy under this application.
Herewith filing for sprinkler modifications in conjunction w/ 6th flr chem lab renovations per plans.
Subsequent sprinkler and standpipe application filed herewith.
Foundation design to facilitate proposed enlargement of existing building as per plans.
Plumbing work in conjunction with NB B00611202-I1 (Building B). Affordable housing. HUB consultation accepted on 9/21/21 (300 Nevins St).
HVAC work related to renovation of townhouse and change from two family to one. No change to use, egress or occupancy.
Structural Framing for proposed Vertical and Horizontal enlargement, as per plans.
Renovation of office space on 1st and 2nd floors of MAIN ADMINISTRATIVE BUILDING as per plans. No change in use, egress, or occupancy.
Plumbing work in conjunction with NB B00611202-I1 (Building B). Affordable housing. HUB consultation accepted on 9/21/21 (300 Nevins St).
HVAC work related to renovation of townhouse and change from two family to one. No change to use, egress or occupancy.
Herewith filing for sprinkler modifications in conjunction w/ 6th flr chem lab renovations per plans.
Installation of pipe scaffolding as per plans. pipe scaffolding shall comply with chapter # 33 of the nyc code 2022, no changes in use egress or occupancy under this application.
Structural Framing for proposed Vertical and Horizontal enlargement, as per plans.
Plumbing work in conjunction with NB B00611202-I1 (Building B). Affordable housing. HUB consultation accepted on 9/21/21 (300 Nevins St).
Foundation design to facilitate proposed enlargement of existing building as per plans.