Building Permits in ZIP 11215
Brooklyn, NY — 990 permits filed recently
990 permits
Repair of sidewalk vault
Structural work related to alterations proposed under ALTCO GC B01079036-I1
Obtain CO for reconfigured two family dwelling. PL,SP,ST,MS under subsequent worktypes.
Structural work related to alterations proposed under ALTCO GC B01079036-I1
Installation of sub-slab depressurization system. no change in use, egress, or occupancy
Obtain CO for reconfigured two family dwelling. PL,SP,ST,MS under subsequent worktypes.
Plumbing work for renovation of existing 3 family dwellings; no change to occupancy, use or egress; gc filed under dob now buildb01253011-i1
This application is to remove the existing building, retaining a portion of the cellar & foundation, and erect a new four-story, three-family residence using the existing foundation.
New partial height interior non-bearing partitions and entry check-in doors on first floor with additional minor scope on other floors related to #321364171. no change in bulk, use, occupancy, or egre...
Removal & reinstallation of plumbing systemthroughout 3 (3)-story, one (1) dwelling unit w/cellar as per plan show.
Install new sprinkler system (53 new heads). install new plumbing fixtures at new roughing (2 w/m, 1 f.d., 7 lavs, 5 wc, 3 showers, 2 sinks, 2 dw, 1 tub). install new gas piping (2 stoves, 2 h.w.h.)
To file MS work type to Install new HVAC for unit H1R. No change in use, egress or occupancy under this application.
Repair of sidewalk vault
Renovation of basement floor and rear one story enlargement in basement level. no chage to use, egress or occupancy.
Interior renovation for tenant fitout in mixed use building - in an existing eating & drinking establisment (under 75 persons)
Bmh cch: facade repair as per plans filed herewith. no change to zoning, use, egress, or occupancy.
Bmh main campus: facade repair, including brick repointing, lintel repair and window replacement as per plans filed herewith. no change to zoning, use, egress, or occupancy.
Removal & reinstallation of plumbing systemthroughout 3 (3)-story, one (1) dwelling unit w/cellar as per plan show.
Repair of sidewalk vault
To file MS work type to Install new HVAC for unit H1R. No change in use, egress or occupancy under this application.