Building Permits in ZIP 11212
Brooklyn, NY — 625 permits filed recently
625 permits
Installation of suspended scaffold and material hoist for exterior facade repairs and facade inspection. suspended scaffold and material hoist shall comply with chapter 33 of the 2022 nyc bc. no chang...
Installation of plumbing fixtures along with related piping.1 meter, 3 lavs, 3 water closets, 3 kitchen sinks, 2 duplex booster pumps, 6 pressure reducing valves.
Installation of suspended scaffold and material hoist for exterior facade repairs and facade inspection. suspended scaffold and material hoist shall comply with chapter 33 of the 2022 nyc bc. no chang...
Installation of plumbing fixtures along with related piping.1 meter, 3 lavs, 3 water closets, 3 kitchen sinks, 2 duplex booster pumps, 6 pressure reducing valves.
Application filed herewith to convert an existing 3 story 2 family building into an 8 family
Application filed herewith to convert an existing 3 story 2 family building into an 8 family
Installation of solar panels, rooftop, grid tied, railed, 17 modules, 6.97 KW
New mechanical work with ERV units for intake and exhaust and new heat pump for heating and cooling in conjunction with NB filing 321598972.
Installation of solar panels, rooftop, railed, grid-tied, 8 modules, 3.52kw
Installation of solar panels, rooftop, railed, grid-tied, 8 modules, 3.52kw
New mechanical work with ERV units for intake and exhaust and new heat pump for heating and cooling in conjunction with NB filing 321598972.
Installation of solar panels, rooftop, grid tied, railed, 17 modules, 6.97 KW
Scope of work includes the replacement of gas boilers and associated piping and ductwork.
Installation of pipe scaffolding and heavy duty sidewalk shed as per plans. temporary equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this applica...
Scope of work includes the replacement of gas boilers and associated piping and ductwork.
Installation of pipe scaffolding and heavy duty sidewalk shed as per plans. temporary equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this applica...
Proposed interior renovation converting existing 3 story and cellar into a 10 unit residential building.
New mechanical work with erv units for intake and exhaust and new heat pump for heating and cooling in conjunction with nb filling 321598981
Proposed interior renovation converting existing 3 story and cellar into a 10 unit residential building.
Full demolition application of a 1 high story brick and steel with concrete building.