Building Permits in ZIP 11212
Brooklyn, NY — 614 permits filed recently
614 permits
Installation of construction trailer as per plans filed herewith
Facade repairs. No change in egress, use or occupancy.
Structural work as shown on plans
Proposed installation of heavy duty sidewalk shed for remedial repairs as per plans. no change in use occupancy or egress under this application. live load 300 per square feet. sidewalk shed shall com...
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this application.
Installation of construction trailer as per plans filed herewith
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this application.
Structural work as shown on plans
Interior renovation to build commercial laundry, work includes installation of minor partitions and door, concrete pad for wahers, supporting columns amd dryer exhauset vent.
Facade repairs. No change in egress, use or occupancy.
Proposed installation of heavy duty sidewalk shed for remedial repairs as per plans. no change in use occupancy or egress under this application. live load 300 per square feet. sidewalk shed shall com...
Installation of temporary construction chain link fence as per plans
Installation of construction trailer as per plans filed herewith
Filing herewith tax abatement application for installation of roof-mounted solar panels. no change in use, egress, or occupancy.
Disconnect & remove existing floor mounted steam radiator with all accessories. provide new floor mounted steam convector along with supports.
Installation of construction trailer as per plans filed herewith
general construction work as per plans filed herewith. no change to use, egress or occupancy
Installation of construction trailer as per plans filed herewith
general construction work as per plans filed herewith. no change to use, egress or occupancy
Disconnect & remove existing floor mounted steam radiator with all accessories. provide new floor mounted steam convector along with supports.