Building Permits in ZIP 11211
Brooklyn, NY — 838 permits filed recently
838 permits
Installation of overhead protection as per plans. in compliance with chapter 33 of nycbc. no change in use, egress or occupancy
Lidl w - filing herewith for plumbing work related to the renovation of the existing space. there will be no change in egress, occupancy or use.
Relocation and new installation of plumbing fixtures and gas appliances in cellar, first, second and third floor.
Alteration. replace wall finish for all stairwells. no change in use, occupancy or egress.
Interior renovation as shown on plans filed herewith.
Installation of overhead protection as per plans. in compliance with chapter 33 of nycbc. no change in use, egress or occupancy
Filing for approval of pump jack plan.
Installation of pump jack scaffolds in conjunction with NB #B00637100-I1.
underground plumbing only for water and sewer as per the approved Site connection
Filing for plumbing application for restaurant, no change in use, egress and occupancy.
Retrofit existing schoolyards to include green infrastructure (gi) that will manage stormwater runoff from the tributary impervious surfaces. the work is part of nyc's gi program with the primary goal...
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or...
Installation of temporary fence for NYCDEP Contract # GI-CONS-3
Illuminated non-advertising accessory wall sign - baker health. no change of use, egress or occupancy.
Plumbing work filed in conjunction with the combing and renovation of stores.
Re-connection of replaced boilers
Boilers replacement
Boilers replacement. Boiler job is in conjunction with job# B01102784.
Propose plumbing and sprinkler work for apt#6b. no change to use, egress, or occupancy.
This application is being filed for the installation of kitchen & toilet exhaust fans, (6) new heat pumps at rear yard and related air handling units from cellar through third floor.