Building Permits in ZIP 11208
Brooklyn, NY — 369 permits filed recently
369 permits
Replac exist (7) roof drains. relocate exist (4) vent stack & extend 4' above finished roof. Power flush, clean & test new vent stack. Power flush & clean entire storm drains system, all leaders & sto...
This application is filed to add cc
Full demolition of one-car garage
Interior renovation of existing commercial space to install new cooking equipment and plumbing fixtures. No change of use, egress, or occupancy.
Full demolition of one-car garage
Replac exist (7) roof drains. relocate exist (4) vent stack & extend 4' above finished roof. Power flush, clean & test new vent stack. Power flush & clean entire storm drains system, all leaders & sto...
This application is filed to add cc
Interior renovation of existing commercial space to install new cooking equipment and plumbing fixtures. No change of use, egress, or occupancy.
install construction site fence around construction area
Installation of mechanical ventilation and riser for an active sub-slab depressurization system. no change in use egress or occupancy. filed in conjunction with nb #b00972461-i1
Mechanical work filed in conjunction with the architecture application. no change to use, egress or occupancy.
Plumbing work filed in conjuction with the gc application. no change in use, egress or occupancy.
Construction fence filing forproposed new 3- story buildingfor three dwelling units.
New Storm-water sewer work from the existing detention tank that is routed through the site. Work includes replacing the storm sewer connection to the city sewer in Autumn Avenue and associated sitewo...
New Storm-water sewer work from the existing detention tank that is routed through the site. Work includes replacing the storm sewer connection to the city sewer in Autumn Avenue and associated sitewo...
Plumbing work filed in conjuction with the gc application. no change in use, egress or occupancy.
Construction fence filing forproposed new 3- story buildingfor three dwelling units.
Mechanical work filed in conjunction with the architecture application. no change to use, egress or occupancy.
New Storm-water sewer work from the existing detention tank that is routed through the site. Work includes replacing the storm sewer connection to the city sewer in Autumn Avenue and associated sitewo...
install construction site fence around construction area